Her Majesty the Queen in Right of Ontario as Represented by the Minister of the Environment, Conservation and Parks - Environmental Compliance Approval (sewage)

Instrument type: Environmental Compliance Approval (sewage)

ERO number
026-0065
Ministry reference number
5510-DJPHEZ
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal
Proposal posted
Comment period
January 19, 2026 - March 5, 2026 (45 days) Open
Last updated

This consultation closes at 11:59 p.m. on:
March 5, 2026

Proposal summary

This proposal is to amend the Environmetnal complaince Approval No. 3102-A9SNHB. Ontario Parks is intending on expanding the Presqu’ile Provincial Park with up to 42 campsites in the group camping area of the park.

Location details

Site address

328 Presqu'ile Parkway
Brighton , ON
Canada

Site location details

Presqu'ile Provincial Park

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Her Majesty the Queen in Right of Ontario as Represented by the Minister of the Environment, Conservation and Parks
300 Water Street
Peterborough, ON
K9J 3C7
Canada

Proposal details

Ontario Parks is intending on expanding the Presqu’ile Provincial Park with up to 42 campsites in the group camping area of the park. The proposed expansion will include a new mini comfort station and trailer sanitary dumping station that will be serviced by a new septic system. The proposed sewage works will be rated for an average daily sewage flow of 18,670 liter per day.

The proposed sewage works will be comprised of two 22,000 liter septic tanks servicing the proposed comfort station, one 30,000 liter septic tank servicing the trailer dumping station, and one 30,000 liter balancing tank, equipped with two submersible effluent pumps. The leaching bed will be comprised of a fully-raised leaching chamber septic bed, rated for a design sewage flow of 15,250 liters per day and comprised of 28 runs of 20.4 meter long trenches. Each trench will be comprised of 16 Equalizer EQ36 chambers and two end caps. The leaching bed will consist of a 52 metres x 38 metres sand contact area.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada

Office phone number

Comment

Let us know what you think of our proposal.

Have questions? Get in touch with the contact person below. Please include the ERO number for this notice in your email or letter to the contact.

Read our commenting and privacy policies.

Submit online

Submit by mail

Contact

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice