St. Clair Region Conservation Authority - Environmental Compliance Approval (sewage)

Instrument type: Environmental Compliance Approval (sewage)

ERO number
026-0101
Ministry reference number
9010-DQ2LQ8
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal
Proposal posted
Comment period
January 29, 2026 - March 15, 2026 (45 days) Open
Last updated

This consultation closes at 11:59 p.m. on:
March 15, 2026

Proposal summary

This proposal is for a new Environmental Compliance Approval (sewage) as part of a proposed trailer park expansion of on-site sewage systems serving A.W. Campbell Conservation Area located at 8477 Shiloh Line, in Alvinston, in the Municipality of Brooke-Alvinston, Ontario.

Location details

Site address

8477 Shiloh Line
Brooke-Alvinston, ON
Canada

Site location details

A.W. Campbell Conservation Area

8477 Shiloh Line

Municipality of Brooke-Alvinston, County of Lambton, ON

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

St. Clair Region Conservation Authority
8477 Shiloh Line
Brooke-Alvinston, ON
N0N 1A0
Canada

Proposal details

This proposal is for a new Environmental Compliance Approval (sewage) as part of a proposed trailer park expansion of on-site sewage systems serving A.W. Campbell Conservation Area located at 8477 Shiloh Line, in Alvinston, in the Municipality of Brooke-Alvinston, Ontario.

The existing septic system on Site will be replaced by a larger subsurface sewage disposal system to support the existing 146 seasonal trailer sites on the property, where the 112 seasonal trailer lots are proposed to connect to an onsite gravity sewage system. The onsite subsurface sewage disposal system will be divided into two separate raised absorption trench systems.

The north washroom facility will combine sewage flows with 8 seasonal trailer sites, to operate with a total daily flow rate of 9,500 liters per day. The south washroom facility will combine with 104 seasonal trailer sites, to operate with a total daily flow rate of 35,900 liters per day. The daily design sanitary sewage flow is approximately 45,400 liters per day.

The proposed modification to the existing sewage works consist of the installation of:

  • a 19,000 litres septic tank at the north washroom treatment system
  • a 71,800 litres septic tank at the north washroom treatment system
  • pump chambers when gravity flow is not feasible
  • dosing chambers
  • two raised Class 4 subsurface disposal beds

These proposed works will service the 146 trailer sites located at the Park.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada

Office phone number

Comment

Let us know what you think of our proposal.

Have questions? Get in touch with the contact person below. Please include the ERO number for this notice in your email or letter to the contact.

Read our commenting and privacy policies.

Submit online

Submit by mail

Contact

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice