Greenstone Gold Mines GP Inc. - Environmental Compliance Approval (sewage)

Instrument type: Environmental Compliance Approval (sewage)

ERO number
026-0203
Ministry reference number
8115-DPUJRJ
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal
Proposal posted
Comment period
February 23, 2026 - April 9, 2026 (45 days) Open
Last updated

This consultation closes at 11:59 p.m. on:
April 9, 2026

Proposal summary

This proposal is for an amendment to the Environmental Compliance Approval (ECA) No. 0735-C9PMD6 for various water management ponds and collection ditches serving Greenstone Gold Mines Tailings Management Facilities located at 7921 Highway 11, in Geraldton, Municipality of Greenstone, District of Thunder Bay, Ontario.

Location details

Site address

7921 Highway 11
Geraldton
Municipality of Greenstone, ON
Canada

Site location details

7921 Hwy 11, Greenstone, Ontario, P0T 1M0, Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Greenstone Gold Mines GP Inc.
7921 Highway 11
Geraldton, ON
P0T 1M0
Canada

Proposal details

This proposal is for an amendment to the Environmental Compliance Approval (ECA) No. 0735-C9PMD6 for various water management ponds and collection ditches serving Greenstone Gold Mines Tailings Management Facilities located at 7921 Highway 11, in Geraldton, Municipality of Greenstone, District of Thunder Bay, Ontario.

Due to the topography of the area, there is a large additional area outside of the Waste Rock Storage Area (WRSA) D that would be directed to the contact water ditch if a non-contact water diversion berm and channel was not in place. The diversion berm and channel are designed to direct non-contact water away from ditch D2-A and Pond D2.

The purpose of this application is to amend the ECA No. 0735-C9PMD6 to permit a non-contact water diversion berm and channel along the perimeter of ditch D2-A and Pond D2. There is no change to the WRSA seepage water collection or conveyance to Effluent Treatment Plant for treatment and discharge.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada

Office phone number

Comment

Let us know what you think of our proposal.

Have questions? Get in touch with the contact person below. Please include the ERO number for this notice in your email or letter to the contact.

Read our commenting and privacy policies.

Submit online

Submit by mail

Contact

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice