Ontario Parks is seeking input regarding proposed amendments to the John E. Pearce Provincial Park Management Plan. The proposed changes will ensure that the plan is consistent with the park’s Nature Reserve classification and protects the natural and cultural heritage values of the park.
An amended Environmental Compliance Approval (air and noise) has been granted to CalClean, Inc. The facility undertakes mobile soil and groundwater remediation at sites throughout Ontario.
September 4, 2025 - October 19, 2025 (45 days) Open
Last updated
This proposal is to amend the Environmental Compliance Approval Number 0006-8VPPS3 to upgrade and expand an existing wastewater treatment plant and surface water discharge system to service Phase 1 of the Shelter Cove Adult Lifestyle Community, located in Selkirk, Ontario.
An Environmental Compliance Approval with Limited Operational Flexibility (air) has been issued to Aisin Canada Inc. This Approval will allow the company to operate an automotive parts manufacturing facility, located in the City of Stratford, Ontario.
January 24, 2025 - March 10, 2025 (45 days) Closed
Last updated
An amended Environmental Compliance Approval has been issued for sewage works servicing Brooks Road Landfill, located at 160 Brooks Road in Cayuga, Haldimand County, Ontario.
An amended Environmental Compliance Approval has been issued for the collection, transmission and treatment of pulp and paper mill effluent for discharge to Nipigon Bay, Lake Superior.
October 30, 2024 - December 14, 2024 (45 days) Closed
Last updated
A new Environmental Compliance Approval has been issued for stormwater management works serving 2822071 Ontario Ltd., located at 3033 East Street, Fordwich, Ontario.
The director has amended Environmental Compliance Approval (air & noise) No. 6254-9LVQ3V for Imperial Oil Limited to temporarily operate thermal oxidizers to mitigate benzene and other volatile organic compound emissions during facility improvement activities.
October 17, 2022 - December 1, 2022 (45 days) Closed
Last updated
This proposal is for an amendment to Environmental Compliance Approval No. 5377-9CXPXG to permit modifications to an existing leachate treatment and discharge system for an existing woodwaste landfill, owned and operated by Mansteel New Liskeard Inc., located in Temiskaming Shores, Ontario.
Instrument type:
Approval to register for a technical standard for air pollution (industry standard)
ERO number
019-7053
Notice type
Instrument
Notice stage
ProposalUpdated
Proposal posted
Comment period
August 1, 2023 - September 15, 2023 (45 days) Closed
Last updated
This proposal is for AV Terrace Bay Inc. located in Terrace Bay, Ontario, to amend their existing registration under the Technical Standards Registry–Air Pollution (Technical Standards Registry). This facility will adhere to all technical and operational requirements in the Pulp and Paper–Industry Standard under the Local Air Quality Regulation.
This Permit to Take Water has been issued to Lafarge Canada Inc. in Greater Napanee, Ontario for the purposes of renewing Permit to Take Water No. 7150-9YLP4X. Water will be taken from two ponds for aggregate washing, industrial manufacturing, and dewatering purposes, located in the Town of Greater Napanee, Ontario.
Permit to Take Water No. P-300-5335755583 has been issued to 2253667 ONTARIO LIMITED for golf course irrigation purposes. Water will be taken from two ponds, located in Port Stanley, Ontario.
This approval is for establishment of industrial stormwater management Works to service enhanced Passenger Pick up area at the Ajax Go Station located at Westney Road South, for the collection, transmission, treatment and disposal of stormwater run-off from a sub-catcthcment area of 0.71 hectares of the 2.184 ha. for 80% sediment removal.
September 3, 2025 - October 18, 2025 (45 days) Open
Last updated
The proposal is for a new Environmental Compliance Approval for municipal stormwater management works serving the City of Ottawa, Springhill Landfill Remedial Action Plan and Closure Plan.
September 3, 2025 - October 18, 2025 (45 days) Open
Last updated
This proposal is for a new Environmental Compliance Approval (air & noise) for Green Infrastructure Partners Inc. for the operation of a portable hot-mix asphalt plant, located at various sites across Ontario.
September 3, 2025 - October 18, 2025 (45 days) Open
Last updated
Amendment to Environmental Compliance Approval (ECA No. 3855-ANGLJG) for a waste disposal site located at 7510 Bren Road in the City of Mississauga, Ontario.
We are moving forward with regulatory changes to make it easier for proponents to apply for a permit to take water when a previous permit has been cancelled, revoked, or expired within the past year in limited circumstances. These changes will give applicants more flexibility while maintaining oversight.