The Minister approved amendments to the Grand River Assessment Report and Source Protection Plan to update vulnerability and threats assessments for municipal residential water systems at Erb Street, Strange Street, William Street, and Blair Road in Waterloo. New non-binding policies address future liquid hydrocarbon pipeline threats.
We issued an Environmental Compliance Approval (air & noise) with Operational Flexibility to Listowel Technology Inc., a manufacturer of interior and exterior automotive plastic injected parts, located in Listowel, Ontario.
December 30, 2024 - January 29, 2025 (30 days) Closed
Last updated
Permit to Take Water No. 2455-DF3L9U has been issued to 1000770730 Ontario Inc. renewing PTTW Reference No. 7202-D5ZPZR for golf course irrigation purposes. Water will be taken from one well located in the Township of Uxbridge, Ontario for 10 years.
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air and noise) from Colourific Coatings Ltd., a facility providing powder coating to metal parts, located in the City of Vaughan, Ontario.
Instrument type:
Changes to the site plan for a pit or quarry
ERO number
025-0235
Notice type
Instrument
Notice stage
Proposal
Proposal posted
Comment period
April 1, 2025 - June 2, 2025 (62 days) Closed
Last updated
Dufferin Aggregates, a CRH Company (Dufferin) operates the site on behalf of University of Guelph. Dufferin seeks to amend the current site plan to change the final depth of extraction from above the water table to below the water table in additional areas of the site.
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air) from 1528593 Ontario Inc., an automotive plastic parts manufacturing and decorative facility, located in the Town of Wallaceburg, Ontario.
This proposal is for a new Environmental Compliance Approval (sewage) for 1675 Kilworthy Road, Town of Gravenhurst, Ontario, for the establishment of a subsurface disposal works for the collection, and disposal of domestic sewage with a maximum design capacity of 32,000 litres per day, to service a proposed two new seasonal cottages and a bunkie.
September 21, 2023 - November 5, 2023 (45 days) Closed
Last updated
Approval is granted for an amendment to the existing Environmental Compliance Approval No. 7153-4EFLA9 for Cardi Construction Limited, to include proposed stormwater management works to service an existing industrial site, located at 600 Nebo Road in Hannon, Ontario.
October 21, 2024 - December 5, 2024 (45 days) Closed
Last updated
Application for the establishment of industrial stormwater management works to service a Car Wash Facility, located west of Palladium Drive for the collection, transmission, treatment and disposal of stormwater run-off from a total catchment area of 0.54 hectares, to provide Enhanced Level water quality protection, quantity and erosion control.
The Director of Exploration has made a decision on the exploration permit application PR-25-000012 to Generation PGM Inc. for early exploration activities.
The decision is to: issue the mineral exploration permit.
The Director of Exploration has made a decision on the exploration permit application PR-25-000013 to Generation PGM Inc. for early exploration activities.
The decision is to: issue the mineral exploration permit.
January 27, 2022 - March 13, 2022 (45 days) Closed
Last updated
The Ministry is entering its second phase of consultation as part of the development process for the next edition of Ontario’s Building Code. This consultation focuses on changes related to the new 2020 National Construction Codes.
October 25, 2022 - December 9, 2022 (45 days) Closed
Last updated
The Ministry of Municipal Affairs and Housing is entering its third and final phase of consultation on the next edition of Ontario’s Building Code. As part of this phase, changes to an energy efficiency requirement and sewage system provisions (Part 8 of the Building Code) are proposed.
November 14, 2024 - December 14, 2024 (30 days) Closed
Last updated
The Permit to Take Water No. 8372-DE7PKZ was issued to GIP Properties Corp. on March 26, 2025, for renewal of PTTW No. 7312-CJ4J9E. Water will be taken from one sump for industrial dewatering purposes, in the Municipality of North Grenville, United Counties of Leeds and Grenville, Ontario, for 10 years.
Instrument type:
Approval to amend a municipality’s official plan
ERO number
019-3106
Notice type
Instrument
Notice stage
ProposalUpdated
Proposal posted
Comment period
December 5, 2022 - February 3, 2023 (60 days) Closed
Last updated
We want to inform you that the Ministry of Municipal Affairs and Housing has received Official Plan Amendment 482 (OPA 482) from the City of Toronto for a decision. OPA 482 proposes to identify two Protected Major Transit Station Areas in accordance with subsection 16 (15) of the Planning Act.
October 24, 2024 - November 23, 2024 (30 days) Closed
Last updated
The Director of Exploration has made a decision on the exploration permit application PR-24-000206 to Rockland Resources for early exploration activities.
The decision is to issue the mineral exploration permit.