November 25, 2019 - January 9, 2020 (45 days) Closed
Last updated
An Environmental Compliance Approval (air) was issued to Reynolds Consumer Products Canada Inc./Produits de Conssommation Reynolds Canada Inc. for all emission sources from the facility that exhaust to the atmosphere.
Instrument type:
Approval for variance from the Liquid Fuels Handling Code
ERO number
019-1650
Notice type
Instrument
Notice stage
Proposal
Proposal posted
Comment period
April 14, 2020 - May 14, 2020 (30 days) Closed
Last updated
Original Traders Energy (OTE), a supplier and distributer petroleum products, is building a new facility at 180 Industrial Park Drive, Shannonville, Ontario, K0K 3A0. The company wants to *manifold the *Stage I vapour recovery header on the loading skid for the underground storage tanks at this site.
The Director of Exploration has made a decision to issue the exploration permit application PR-20-000063 to John Brady for early exploration activities near Sudbury, Ontario.
February 11, 2020 - March 27, 2020 (45 days) Closed
Last updated
An amended Environmental Compliance Approval No. A280229 was issued on April 03, 2020 for GFL Environmental, a waste transfer site located at 100 Unwin Avenue and 200 Unwin Avenue, in the City of Toronto, Ontario.
September 6, 2019 - October 21, 2019 (45 days) Closed
Last updated
An Environmental Compliance Approval with Limited Operational Flexibility (Air), which replaces all the current Environmental Compliance Approvals for Air, has been granted for Royal Adhesives & Sealants Canada Ltd., located in Toronto, Ontario.
September 11, 2019 - October 25, 2019 (45 days) Closed
Last updated
An Environmental Compliance Approval with Limited Operational Flexibility (Air) has been issued to BridgePort Windsor Marine Terminal Inc., former name: 1544929 Ontario Limited.
An Environmental Compliance Approval with Limited Operational Flexibility (Air) has been granted to Agnico Eagle Mines Limited for the advanced mine exploration program on the Upper Beaver property located approximately 5 kilometres northeast of Dobie, Ontario.
October 4, 2019 - November 18, 2019 (45 days) Closed
Last updated
An Environmental Compliance Approval was issued for Coland Developments Corporation for stormwater management works to serve an office/commercial development located in the Town of Midland, Ontario.
A new Environmental Compliance Approval (Industrial Sewage) No. 8827-BMLK8D was issued for the establishment of stormwater management works to service one (1) large warehouse located at 24 Clearview Drive in Tillsonburg, Ontario.
Instrument type:
Approval for variance from the Liquid Fuels Handling Code
ERO number
019-1624
Notice type
Instrument
Notice stage
Proposal
Proposal posted
Comment period
April 8, 2020 - May 8, 2020 (30 days) Closed
Last updated
2538459 ONTARIO INC wants to keep the VersapipeTM 4710 piping (a high-density polyethylene pipe commonly used by the natural gas industry) in place at its facility. The pipe was installed as vent piping for underground tanks and would be very expensive to dig up and replace.
Instrument type:
Approval for variance from the Liquid Fuels Handling Code
ERO number
019-1623
Notice type
Instrument
Notice stage
Proposal
Proposal posted
Comment period
April 8, 2020 - May 8, 2020 (30 days) Closed
Last updated
2624827 ONTARIO INC wants to keep the VersapipeTM 4710 piping (a high-density polyethylene pipe commonly used by the natural gas industry) in place at its facility. The pipe was installed as vent piping for underground tanks and would be very expensive to dig up and replace.
November 29, 2019 - January 13, 2020 (45 days) Closed
Last updated
We have issued an Environmental Compliance Approval No. 4476-BMDPXM to 11092812 Canada Inc. for the construction of stormwater management works for its Cambridge Pet Foods facility located in the City of Cambridge.
January 15, 2020 - February 29, 2020 (45 days) Closed
Last updated
We have issued an Environmental Compliance Approval with Limited Operational Flexibility (Air) to Atlantic Industries Limited located in Ayr, Township of North Dumfries.
October 9, 2018 - November 9, 2018 (30 days) Closed
Last updated
Permit to Take Water No. 1441-B5DLD4 was issued, which cancels and replaces Permit to Take Water No. 1620-A39LKB. The permit was issued on December 4, 2018 with an expiry date of October 31, 2021.
Environmental Compliance Approval No. 5920-BN7THB was issued to Pathways Regional Inc. for the construction of storm and sanitary sewer and stormwater storage system serving the 0.9 ha residential townhouse development in Block 225, located in the south portion of the Leitrim Development Area, at the Findlay Creek subdivision in the City of Ottawa.