Update Announcement
This proposal notice has been updated on March 05, 2018 to advise the public that this application is still under active review. The ministry is reviewing the comments it has received to date. The original proposal date and comment period have not been altered.
This consultation was open from:
February 4, 2016
to March 20, 2016
Decision summary
We have approved a new Environmental Compliance Approval (Sewage) No. 8643-BF2QE3 for Hidden Village Campground for the establishment of subsurface disposal works in Chelmsford, Ontario.
Location details
Site address
2292 Morgan Road
Greater Sudbury,
ON
P0M 1L0
Canada
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
Barry & Linda Miles
2292 Morgan Road
Greater Sudbury,
ON
P0M 1L0
Canada
Decision details
On October 16, 2019 we have approved a new Environmental Compliance Approval No. 8643-BF2QE3 for Hidden Village Campground for the establishment of subsurface disposal works.
The new subsurface disposal works is for the collection, transmission, treatment and disposal of domestic sewage from one (1) cabin, ninety-four (94) campsites, and one (1) 70 seat assembly hall located at 2292 Morgan Drive in Chelmsford, Ontario.
The upgraded sewage works include:
- one (1) 7,450 litre concrete septic tank
- one (1) 23,000 litre concrete septic tank
- one (1) 3,000 litre dosing tank
- one (1) disposal bed
The daily design sanitary sewage capacity of all the sewage works at the site is approximately 29,000 litres per day.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
199 Larch Street
Suite 1201
Sudbury,
ON
P3E 5P9
Canada
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
How to Appeal
This instrument decision can be appealed. You have 15 days from November 5, 2019 to begin the appeal process.
Carefully review the information below to learn more about the appeal process.
How to appealClick to Expand Accordion
For instrument decisions published on or after June 1, 2021, please refer to the updated instructions for information on how to appeal a decision.
Appeal process for decisions published before June 1, 2021
If you’re an Ontario resident, you can start the process to appeal this instrument decision.
First, you’ll need to seek leave (i.e. get permission) from the relevant appellate body to appeal the decision.
If the appellate body grants leave, the appeal itself will follow.
Seek leave to appeal
To seek leave to appeal, you need to do these three things:
- prepare your application
- provide notice to the minister
- mail your application to three parties
1. Prepare your application
You’ll need to prepare an application. You may wish to include the following things in your application:
- A document that includes:
- your name, phone number, fax number (if any), and/or email address
- the ERO number and ministry reference number (located on this page)
- a statement about whether you are a resident in Ontario
- your interest in the decision, and any facts you want taken into account in deciding whether you have an interest in the decision
- the parts of the instrument that you’re challenging
- whether the decision could result in significant harm to the environment
- the reason(s) why you believe that no reasonable person – having regard to the relevant law and to any government policies developed to guide decisions of that kind – could have made the decision
- the grounds (facts) you’ll be using to appeal
- the outcome you’d like to see
- A copy of the instrument (approval, permit, order) that you you are seeking leave to appeal. You’ll find this in the decision notice on the Environmental Registry
- Copies of all supporting documents, facts and evidence that you’ll be using to appeal
What is considered
The appeal body will consider the following two questions in deciding whether to grant you leave to appeal:
- is there is good reason to believe that no reasonable person, with respect to the relevant law and to any government policies developed to guide decisions of that kind, could have made the decision?
- could the decision you wish to appeal result in significant harm to the environment?
2. Provide your notice
You’ll need to provide notice to the Minister of the Environment, Conservation and Parks that you’re seeking leave to appeal.
In your notice, please include a brief description of the:
- decision that you wish to appeal
- grounds for granting leave to appeal
You can provide notice by email at minister.mecp@ontario.ca or by mail at:
College Park 5th Floor, 777 Bay St.
Toronto, ON
M7A 2J3
3. Mail your application
You’ll need to mail your application that you prepared in step #1 to each of these three parties:
- appellate body
- issuing authority (the ministry official who issued the instrument)
- proponent (the company or individual to whom the instrument was issued)
Barry & Linda Miles
2292 Morgan Road
Greater Sudbury,
ON
P0M 1L0
Canada
Environmental Review Tribunal
Attention: The Secretary
655 Bay Street
Floor 15
Toronto, Ontario
M5G 1E5
(416) 212-6349
(866) 448-2248
OLT.Registrar@ontario.ca
Include the following:
This is not legal advice. Please refer to the Environmental Bill of Rights for exact legal requirements. Consult a lawyer if you need help with the appeal process.
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Original proposal
Proposal details
Description of instrument
This proposal is for a new Environmental Compliance Approval (Sewage) for Hidden Village Campground for the establishment of subsurface disposal works to serve one (1) cabin, ninety-four (94) campsites, and one(1) 70 seat assembly hall located at 2292 Morgan Drive in Chelmsford, Ontario.
The proposed replacement sewage works include one (1) 7,450 L concrete septic tank, one (1) 23,000 L concrete septic tank, one (1) 3,000 L dosing tank, and one (1) leachate bed.
The daily design sanitary sewage flow of the entire resort is approximately 28,010 litres per day.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
199 Larch Street
Suite 1201
Sudbury,
ON
P3E 5P9
Canada
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Comment
Commenting is now closed.
This consultation was open from February 4, 2016
to March 20, 2016
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Comments received
Through the registry
0By email
0By mail
0