Proponent: Reeves Construction Limited, 372 Main Street North Post Office Box Delivery 970 Mount Forest Ontario Canada N0G 2L2 Instrument Type: Issuance of a Class A licence to remove more than 20,000 tonnes of aggregate annually from a pit or a quarry - ARA s.
STUDIES THAT MUST BE COMPLETED. 1. Hydrogeological study (last completed 2011) 2. Traffic study (last completed 2013) 3. Environmental Engineering study (never done) which includes public health, dust, air quality and noise 4. site rehabilitation plan (last completed 2015) 5.
View the comments this notice received through the registry. You can either download them all or search and sort below.
Some comments will not be posted online. Learn more about the comment status and our comment and privacy policies.
Download comments
Please be advised that the…
Comment on
Reeves Construction Limited - Issuance of a licence to remove over 20,000 tonnes of aggregate annually from a pit or a quarry
Comment ID
27882
Commenting on behalf of
Comment status
Please be advised that the following motion was passed at the June 1, 2016 Council Meeting.
Read moreRelated actions
Proponent: Reeves…
Comment on
Reeves Construction Limited - Issuance of a licence to remove over 20,000 tonnes of aggregate annually from a pit or a quarry
Comment ID
27883
Commenting on behalf of
Comment status
Proponent: Reeves Construction Limited, 372 Main Street North Post Office Box Delivery 970 Mount Forest Ontario Canada N0G 2L2 Instrument Type: Issuance of a Class A licence to remove more than 20,000 tonnes of aggregate annually from a pit or a quarry - ARA s.
Read moreRelated actions
STUDIES THAT MUST BE…
Comment on
Reeves Construction Limited - Issuance of a licence to remove over 20,000 tonnes of aggregate annually from a pit or a quarry
Comment ID
27892
Commenting on behalf of
Comment status
STUDIES THAT MUST BE COMPLETED. 1. Hydrogeological study (last completed 2011) 2. Traffic study (last completed 2013) 3. Environmental Engineering study (never done) which includes public health, dust, air quality and noise 4. site rehabilitation plan (last completed 2015) 5.
Read moreRelated actions