This consultation was open from:
October 25, 2018
to December 9, 2018
Decision summary
The proposal for a new Environmental Compliance Approval (industrial sewage treatment) for a potato washing facility serving H.J. Vander Zaag Farms Limited was withdrawn by the applicant.
Location details
Site address
3978 Tottenham Road
County of Simcoe
New Tecumseth,
ON
L9R 1V4
Canada
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
H.J. Vander Zaag Farms Limited
5770 County Road 15 Road
Alliston,
ON
L9R 1V3
Canada
Decision details
The proposal for a new Environmental Compliance Approval (industrial sewage treatment) for a potato washing facility serving H.J. Vander Zaag Farms Limited was withdrawn by the applicant.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
54 Cedar Pointe Drive
Unit 1201
Barrie,
ON
L4N 5R7
Canada
How to Appeal
Appeals are not allowed
There is no appeal mechanism for applications withdrawn by the applicant.
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Original proposal
Proposal details
Description of instrument
This proposal is for a new Environmental Compliance Approval for potato washwater serving H.J. Vander Zaag Farms Limited, operating a seasonal potato washing facility at 3978 Tottenham Road in the Town of New Tecumseth.
The potato washwater treatment works comprise of :
- a potato washer,
- a chemically assisted clarification system,
- a biological treatment system for denitrification and
- associated pumps and controls discharging treated washwater to an existing exfiltration lagoon.
The exfiltration lagoon is located west of the existing building and discharges treated wash water to the shallow subsoils.
The Ministry may require monitoring of the industrial wastewater and stormwater effluent discharge leaving the site.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
54 Cedar Pointe Drive
Unit 1201
Barrie,
ON
L4N 5R7
Canada
Comment
Commenting is now closed.
This consultation was open from October 25, 2018
to December 9, 2018
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Comments received
Through the registry
0By email
0By mail
0