This proposal notice is being updated on February 17, 2022 to advise the public that the Closure Plan Amendment is still under review. The original proposal date and comment period have not been altered. The anticipated date of decision has not yet been determined.
This consultation was open from:
February 14, 2019
to March 16, 2019
Decision summary
A new draft Closure Plan Amendment was submitted by the proponent for the Dome Mine. This updated draft replaces the version in this ERO posting.
Location details
Site location details
Tisdale, Whitney, Shaw and Deloro Townships, City of Timmins, Cochrane District.
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
Goldcorp Canada Ltd. (Porcupine Gold Mines)
4315 Gold MIne Road
South Porcupine,
ON
P0N 1H0
Canada
Decision details
This posting will be closed off, as the Closure Plan Amendment originally referenced in this posting has been replaced.
Effects of consultation
Comments received were considered in the decision.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
5520 Highway 101 East
PO Box 3060
South Porcupine,
ON
P0N 1H0
Canada
How to Appeal
Appeals are not allowed
This instrument type cannot be appealed. Learn more about our consultation process.
Connect with us
Contact
Katrina Lauzon
5520 Highway 101 East
PO Box 3060
South Porcupine,
ON
P0N 1H0
Canada
Original proposal
Proposal details
Description of Instrument
Goldcorp Canada Ltd. has submitted a Mine Closure Plan for filing by the Ministry of Energy, Northern Development and Mines as required under the Mining Act. This Closure Plan proposes rehabilitation measures to be implemented upon the eventual closure of Goldcorp Canada Ltd.'s Dome Mine site. The rehabilitation work to be conducted will include:
- securing all mine openings for long term safety
- removal of surface buildings and associated surface infrastructure
- backfilling of the mine water sedimentation ponds
- removal of any contaminated soil
- ensuring the long-term physical and chemical stability of waste rock stockpiles
- ensuring the long-term physical and chemical stability of tailings facilities
- ensuring the long-term stability of the underground workings
- contouring and revegetation of disturbed areas of the site, including site access roads
- physical stability monitoring of the site
- chemical stability monitoring of the site
The following are the major components of this Closure Plan Amendment as proposed by Goldcorp CanadaLtd.
- Closure of the Dome underground operations
- Processing of Borden bulk sample and ore at the Dome Mill
- Raising the No. 6 Tailings Management Area (TMA) dam
- Construction of 100A ramp bulkhead with heater
- Construction of waste to ore processing Plants (permanent Demo Plant and temporary Pilot Plant)
- Construction of mill storage area (Quonset Hut)
- Separation of the Dome and Paymaster Properties into two closure plan
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
5520 Highway 101 East
PO Box 3060
South Porcupine,
ON
P0N 1H0
Canada
Comment
Commenting is now closed.
This consultation was open from February 14, 2019
to March 16, 2019
Connect with us
Contact
Katrina Lauzon
5520 Highway 101 East
PO Box 3060
South Porcupine,
ON
P0N 1H0
Canada
Comments received
Through the registry
2By email
0By mail
0