This consultation was open from:
September 13, 2019
to October 13, 2019
Decision summary
The exploration permit was issued and is valid for a period of 3 years.
Location details
Site location details
Deloro Township
These activities are located approximately 8.5 kilometers southeast of the City of Timmins.
To view where these claims are on a map please use the Mining Lands Administration System. Click on “I want to…” and select “Find a claim” to search by claim numbers or "Find a township" to search by township.
Claim numbers: 110364, 110365, 135661, 292283
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
DH Exploration Incorporated
1645 Goldmine Road
Timmins,
ON
P4N 7C2
Canada
Decision details
The exploration permit was issued once all Aboriginal communities and the public had the opportunity to provide comment or raise their concerns. The exploration permit is valid for a period of 3 years.
Effects of consultation
No comments were received resulting in no impact on the decision whether or not to proceed with this proposal.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
5520 Highway 101 E Highway
PO Box 3060
South Porcupine Ontario,
ON
P0N 1H0
Canada
How to Appeal
Appeals are not allowed
This instrument type cannot be appealed. Learn more about our consultation process.
Connect with us
Contact
Aisha Samuel
5520 Highway 101 East
PO Box 3060
South Porcupine,
ON
P0N 1H0
Canada
Original proposal
Proposal details
DH Exploration Inc. has submitted an application to the ministry as required under the Mining Act for prescribed early exploration activities.
The activities that this permit would allow DH Exploration Inc. to carry out are as follows:
Permit activities
- mechanized Drilling (Assembled Weight >150kg), 1-5 pads
- mechanized Stripping (>100m2 in 200 metre radius)
- pitting and trenching (>3m3 in 200 metre radius)
Plan activities
- geophysical Survey Requiring Generator Type
- mechanized Stripping (<100m2 in 200 metre radius)
- mechanized Drilling (Assembled Weight ≤150kg)
- pitting and Trenching (>1m3, ≤3m3 in 200 metre radius)
- line Cutting (<1.5m width)
An Exploration Permit does not relieve the proponent from compliance with any other requirements that are set out under the Mining Act or any other Act. Further all activities included in the Exploration Permit proposal must be carried out in compliance with O. Reg. 308/12 and the Provincial Standards for Early Exploration.
The Exploration Permit duration will be up to 3 years with the possibility of one renewal for up to 3 years.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
5520 Highway 101 E Highway
PO Box 3060
South Porcupine Ontario,
ON
P0N 1H0
Canada
Comment
Commenting is now closed.
This consultation was open from September 13, 2019
to October 13, 2019
Connect with us
Contact
Owen Rigg
5520 Highway 101 E Highway
PO Box 3060
South Porcupine Ontario,
ON
P0N 1H0
Canada
Comments received
Through the registry
0By email
0By mail
0