Toronto Hydro-Electric System Limited - Environmental Compliance Approval (sewage)

Instrument type: Environmental Compliance Approval (sewage)

ERO number
019-1560
Ministry reference number
2922-BM4K9D
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal Updated
Proposal posted
Comment period
April 14, 2020 - May 29, 2020 (45 days) Closed
Last updated

There is no requirement to post this notice on the Environmental Registry of Ontario, but we want to hear your thoughts. Submit a comment and tell us what you think. Learn about the consultation process and types of notices on the registry.

Update Announcement

A decision for this proposal has been published as a Bulletin under ERO 019-2918 on February 2, 2021.

This consultation was open from:

April 14, 2020
to May 29, 2020

Proposal summary

This proposal is for a new Environmental Compliance Approval for upgrades to a transformer and oil containment system to service 510 Bellamy Road North, Toronto, Ontario.

Location details

Site address

510 Bellamy Road North
Toronto, ON
M1H 1G3
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Toronto Hydro-Electric System Limited
715 Milner Avenue
Toronto, ON
M1B 3C3
Canada

Why consultation isn't required

On April 1, 2020, the Ontario Government made a temporary regulation to respond to the COVID-19 outbreak. Ontario Regulation 115/20 exempts all proposals for policies, acts, regulations and instruments from posting requirements under the EBR until 30 days after the declared emergency is terminated.

Proposal details

This proposal is for a new Environmental Compliance Approval for establishment of sewage works for the collection, transmission, treatment and disposal of stormwater at the Bellamy-Lawrence Station, located at 510 Bellamy Road North, in the City of Toronto, on behalf of Toronto Hydro-Electric System Limited.

The station houses one (1) distribution transformer. The proposed works consist of an individual passive oil containment pit for the transformer having a minimum capacity of approximately 8,800 litres.

The pit liners will be comprised of passive materials with containment system. The system allows rainwater to filter through the liner materials but becomes impermeable when in contact with oil. Given the soil condition at the site, the sub drainage system will be provided below the containment system to prevent water from accumulating in the pit and potentially reducing the available storage capacity.

This drainage system was connected into an on-site detention pit where the rainwater will infiltrate into the subsoil strata.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada

Office phone number
Toronto District Office
Address

5775 Yonge Street
Floor 9
Toronto, ON
M2M 4J1
Canada

Office phone number

Comment

Commenting is now closed.

The comment period was from April 14, 2020
to May 29, 2020

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice