Renewable Energy Approval for the Long Lake Solar Project

ERO number
019-2018
Notice type
Bulletin
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Bulletin posted
Last updated

This notice is for informational purposes only. There is no requirement to consult on this initiative on the Environmental Registry of Ontario. Learn more about the types of notices on the registry.

Bulletin summary

We amended the Renewable Energy Approval for the Long Lake Solar Project to include a storage building as part of the facility.

Why consultation isn't required

This notice informs you of the amendment to the Renewable Energy Approval and your right to require a hearing in respect of this decision.

We consider this a minor amendment and do not expect it to have any significant impact on the environment. Therefore, public consultation is not required.

Bulletin details

On July 22, 2020, we amended Renewable Energy Approval No. 8430-9AEQ6M to include a storage building as part of the facility.

Since the Long Lake Solar Project started operating in 2015, Northland Power Solar Long Lake L.P. has identified a need for a storage building that was not considered during the development of the project.

Heavy snow accumulation on the solar panels during the winter has significant negative impact on the solar facility’s production levels, and as a result, Northland Power has had to use mechanical snow removal equipment at the facility to mitigate impacts to performance.

Northland Power wants to construct a storage building to house the snow removal equipment. The building will be of steel construction with a concrete slab base and will be located in a previously disturbed area of the site in close proximity to the existing maintenance building. All of the details regarding this minor project change are included in the Modification Document posted on the company’s website.

Re-confirmation letters from the Ministry of Natural Resources and Forestry and the Ministry of Heritage, Sport, Tourism and Culture Industries are not required because the change did not result in relocating any project components beyond the project location that was already assessed.

Third party hearing provisions

Any resident of Ontario may require a hearing by the Environmental Review Tribunal (ERT) within 15 days after the date this Decision is loaded to the Environmental Registry by written notice served upon all of the following:

Appellate body
Courier mail should be addressed to:
Environmental Review Tribunal
25 Grosvenor Street, 4th Floor
Toronto ON M7A 1R1

Mail sent through Canada post should be addressed to:
Environmental Review Tribunal
655 Bay Street, Suite 1500
Toronto ON M5G 1E5

Phone: 416-212-6349
Toll free: 1-866-448-2248
TTY: 1-800-855-1155
Email: ERTTribunalsecretary@ontario.ca

Issuing authority

Bahar Aminvaziri, P.Eng.
Director, Section 47.5, Environmental Protection Act
Environmental Permissions Branch
135 St. Clair Avenue West
Floor 1
Toronto ON M4V 1P5
Phone: (416) 314-7974
Toll Free Phone: (800) 461-6290
Email: enviropermissions@ontario.ca

Proponent

Northland Power Solar Long Lake GP Inc., as general partner for and on behalf of Northland Power Solar Long Lake L.P.
30 St. Clair Ave W, 12th Floor
Toronto ON M4V 3A1

An applicant for a hearing shall state in the notice requiring the hearing, (a) a description of how engaging in the renewable energy project in accordance with the renewable energy approval will cause, (i) serious harm to human health, or (ii) serious and irreversible harm to plant life, animal life or the natural environment; (b) the portion of the renewable energy approval in respect of which the hearing is required; and (c) the relief sought.

Further information is provided on the ERT’s website at: http://elto.gov.on.ca/ert/about-the-ert/renewable-energy-appeals/

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice