Rudolf Wahl - Mineral exploration permit

Instrument type: Mineral exploration permit

ERO number
019-2308
Ministry reference number
PR-20-000165
Notice type
Instrument
Act
Mining Act, R.S.O. 1990
Posted by
Ministry of Energy, Northern Development and Mines
Transferred to
Ministry of Mines
Notice stage
Decision
Decision posted
Comment period
August 28, 2020 - September 27, 2020 (30 days) Closed
Last updated

This consultation was open from:
August 28, 2020
to September 27, 2020

Decision summary

The Director of Exploration has made a decision on the exploration permit application PR-20-000165 to Rudy Wahl for early exploration activities near Marathon, Ontario.

The decision is to: Issue

Location details

Proponent(s)

Rudolf Wahl
47 Graham Cres
Marathon, ON
P0T 2E0
Canada

Decision details

Rudolf Wahl has submitted an application to the ministry for an exploration permit as required under the Mining Act for prescribed early exploration activities.

The activities that this permit would allow Rudolf Wahl to carry out are as follows:

  • mechanized drilling (where the drill weight is greater than 150 kilograms)
  • mechanized stripping (greater than 100 square metres in a 200 metres radius)

The potential disturbance from the activities are described as:

Mechanized Surface Stripping: uses heavy equipment to remove vegetation and soil (overburden) from bedrock. The potential environmental disturbance includes (but are not limited to): use of heavy equipment such as bulldozers, backhoes, excavators or forest harvest equipment, to remove soil from the bedrock, washing the bedrock by pumping water from nearby lakes, rivers or streams, and creation of access trails.

Drilling: provides rock samples from below the surface. Testing the samples determines the properties of the soil and rocks, including mineral and metal content. Potential environmental disturbances include (but are not limited to): clearing surface terrain for “drill pads” (small areas cleared for drill rigs and/or helicopters), installing casings (hollow steel pipes called the collar), and pumping water from a sump, nearby lakes, rivers or streams.

Proponents are required to follow provincial standards for early exploration to minimize the impacts to public health, safety and the environment from early exploration activities described above. You can find the standards in the Activities Information Sheets or on the Ministry website under Mining Act Policies, Standards and Directives (see links in “Related links” section).

This notice is provided to receive comments that can be considered in the decision-making process prior to the issuance of an exploration permit.

An Exploration Permit does not relieve the proponent from compliance with any other requirements that are set out under the Mining Act or any other Act. All activities included in the Exploration Permit proposal must be carried out in compliance with Ontario Regulation 308/12 and the Provincial Standards for Early Exploration. The Exploration Permit duration will be up to 3 years with the possibility of one renewal for up to three years.

Comments received

Through the registry

0

By email

0

By mail

0
View comments submitted through the registry

Effects of consultation

No comment was received through the Environmental Registry of Ontario resulting in no impact on the decision to proceed or not with this proposal.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Mineral Development Office (Thunder Bay)
Address

435 James Street South
Suite B002
Thunder Bay, ON
P7E 6E3
Canada

Office phone number

How to Appeal

Appeals are not allowed

This instrument type cannot be appealed. Learn more about our consultation process.

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice

Original proposal

ERO number
019-2308
Ministry reference number
PR-20-000165
Notice type
Instrument
Act
Mining Act, R.S.O. 1990
Posted by
Ministry of Energy, Northern Development and Mines
Proposal posted

Comment period

August 28, 2020 - September 27, 2020 (30 days)

Proposal details

Rudolf Wahl has submitted an application to the ministry for an exploration permit as required under the Mining Act for prescribed early exploration activities.

The activities that this permit would allow Rudolf Wahl to carry out are as follows:

  • mechanized Drilling (where the drill weight is greater than 150 kilograms)
  • mechanized Stripping (greater than 100 square metres in a 200 metres radius)

The potential disturbance from the activities are described as:

Mechanized Surface Stripping: uses heavy equipment to remove vegetation and soil (overburden) from bedrock. The potential environmental disturbance includes (but are not limited to): use of heavy equipment such as bulldozers, backhoes, excavators or forest harvest equipment, to remove soil from the bedrock, washing the bedrock by pumping water from nearby lakes, rivers or streams, and creation of access trails.

Drilling: provides rock samples from below the surface. Testing the samples determines the properties of the soil and rocks, including mineral and metal content. Potential environmental disturbances include (but are not limited to): clearing surface terrain for “drill pads” (small areas cleared for drill rigs and/or helicopters), installing casings (hollow steel pipes called the collar), and pumping water from a sump, nearby lakes, rivers or streams.

Proponents are required to follow provincial standards for early exploration to minimize the impacts to public health, safety and the environment from early exploration activities described above. You can find the standards in the Activities Information Sheets or on the Ministry website under Mining Act Policies, Standards and Directives (see links in “Related links” section).

This notice is provided to receive comments that can be considered in the decision-making process prior to the issuance of an exploration permit.

An Exploration Permit does not relieve the proponent from compliance with any other requirements that are set out under the Mining Act or any other Act. All activities included in the Exploration Permit proposal must be carried out in compliance with Ontario Regulation 308/12 and the Provincial Standards for Early Exploration. The Exploration Permit duration will be up to 3 years with the possibility of one renewal for up to three years.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Mineral Development Office (Thunder Bay)
Address

435 James Street South
Suite B002
Thunder Bay, ON
P7E 6E3
Canada

Office phone number

Comment

Commenting is now closed.

This consultation was open from August 28, 2020
to September 27, 2020

Connect with us

Contact