This notice is for informational purposes only. There is no requirement to consult on this initiative on the Environmental Registry of Ontario. Learn more about the types of notices on the registry.
Why consultation isn't required
This Closure Plan Amendment is proposing a dam construction project in the Tailings Management Area. The raises and dams are being constructed on already present infrastructure on site and as such, no new impacts will occur.
Bulletin details
The scope of the proposed design is to:
- Continue to raise the tailings dam height from an elevation of 290 masl to a crest elevation of 294 masl (metres above sea level).
The dam will be raised using the downstream construction method and will incorporate a composite liner, a downstream filter package, and a rockfill shell.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
5520 Highway 101 E Highway
PO Box 3060
South Porcupine Ontario,
ON
P0N 1H0
Canada
Connect with us
Contact
Jason Postma
5520 Highway 101 East
PO Box 3060
South Porcupine,
ON
P0N 1H0
Canada