Update Announcement
This proposal notice has been updated on August 30th, 2024, to advise the public that this application is still under active review. The ministry is reviewing the comments it has received to date. The original proposal date and comment period have not been altered.
This consultation was open from:
January 21, 2021
to March 21, 2021
Proposal summary
Environmental Compliance Approval (ECA) with Limited Operational Flexibility (air) which replaces all the current ECAs for air at this facility and includes the addition of new, or historically unapproved, sources for all emissions from Suncor Energy Inc. and 1277136 Alberta Ltd., as general partners operating as Suncor Energy Products Partners
Location details
Site address
1900 River Road
Sarnia,
ON
Canada
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
Suncor Energy Inc. and 1277136 Alberta Ltd. as general partners operating as Suncor Engery Products Partnership
1900 River Rd
P.O. Box 307
Sarna,
ON
N7T 7J3
Canada
Proposal details
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air), which replaces all the current Environmental Compliance Approvals for air at this facility, and includes the addition of new, or historically unapproved, sources for all emissions from Suncor Energy Inc. and 1277136 Alberta Ltd., as general partners operating as Suncor Energy Products Partnership, producing various fuel products including gasoline; kerosene; home heating oils; jet and diesels fuels; residual oils for industrial use as well as chemical feedstocks and is located in the City of Sarnia, Ontario.
The proposal includes all sources at the facility, including:
- tanks
- fume hoods
- cooling towers
- boilers
- heaters
- oxidizers
- flares
Emissions to the air from this facility include:
- hydrogen sulphide
- nitrogen oxides
- xylenes
- volatile organic compounds such as: n-hexane; naphthalene, and ethyl benzene
The Environmental Compliance Approval with Limited Operational Flexibility (air), when issued, permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air).
The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Comment
Commenting is now closed.
The comment period was from January 21, 2021
to March 21, 2021