Decision summary
The Director of Rehabilitation has made a decision on the filing of a closure plan for Inventus Mining Corp for advanced exploration activities within Clement and Pardo Townships, District of Nipissing
The decision is to file the advanced exploration closure plan.
Location details
Site location details
The Pardo Advanced Exploration Project is located in the Clement and Pardo Townships, approximately 82 kilometers northeast of Sudbury and 25 kilometers north-northwest of River Valley, Ontario. Access is provided year-round from Highway 539 and 539A through River Valley, then north on Highway 805 for approximately 30 kilometers. The property consists of Mining Lease LEA-109722 located in the Sudbury Mining Division, North Central Ontario. The approximate geographic center of the property is located at 46.798° North, 80.263° West.
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
Inventus Mining Corp.
1785 Frobisher Street
Unit 1
Sudbury,
ON
P3A 6C8
Canada
Decision details
On March 18, 2021 the ministry approved a closure plan within Clement and Pardo Townships, District of Nipissing, to perform advanced exploration activities.
This company’s closure plan has characterized the current conditions at the site, described the project and rehabilitation measures, monitor the program and determine the expected site conditions after closure, along with expected costs of reclamation.
The closure plan was issued after the prescribed requirements under the Mining Act were met.
Effects of consultation
One comment was received through the Environmental Registry of Ontario in support of the decision to proceed with this closure plan.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
933 Ramsey lake Road B6
Sudbury,
ON
P3E 6B5
Canada
How to Appeal
Appeals are not allowed
This instrument type cannot be appealed. Learn more about our consultation process.
Connect with us
Contact
Brian Laine
933 Ramsay Lake Road
Floor B6
Sudbury,
ON
P3E 6B5
Canada
Original proposal
Proposal details
Inventus Mining Corp. has submitted a Mine Closure Plan for the Pardo Project for filing by ENDM as required under the Mining Act. The purpose of the project is to test the gold content and recovery on site by way of a 50,000 tonne bulk sample in a total of 4 separate sites. Should a decision be made not to proceed to production, the property will be closed out according to the measures detailed in the closure plan. The project site will be returned to a forestry and wilderness land use following closure. The information included within this Closure Plan includes baseline environmental studies and geotechnical assessments of aspects of the advanced exploration project.
The following are the major components of this Closure Plan as proposed by Inventus Mining Corp.:
- characterization of current conditions at the site
- project description
- rehabilitation measures
- monitoring program
- expected site conditions after closure, and
- expected costs of reclamation.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
933 Ramsey lake Road B6
Sudbury,
ON
P3E 6B5
Canada
Comment
Commenting is now closed.
This consultation was open from February 10, 2021
to March 12, 2021
Connect with us
Contact
Brian Laine
933 Ramsay Lake Road
Floor B6
Sudbury,
ON
P3E 6B5
Canada
Comments received
Through the registry
1By email
0By mail
0