GFL Environmental Inc. - Environmental Compliance Approval (waste)

Instrument type: Environmental Compliance Approval (waste)

ERO number
019-3923
Ministry reference number
5241-C44SL5
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Decision
Decision posted
Comment period
June 28, 2021 - August 12, 2021 (45 days) Closed
Last updated

This consultation was open from:
June 28, 2021
to August 12, 2021

Decision summary

The application was withdrawn by the applicant so they can conduct further studies in support of their application.

Location details

Site address

North 1/2 of Lot 6, Concession 3
Gladstone, ON
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

GFL Environmental Inc.
9 East Industrial Road
Blind River, ON
P0R 1B0
Canada

Decision details

As the proposed disposal of the hauled sewage are dewatering trenches, the standard requirement is that the groundwater should be a minimum of 1.5 m below the bottom of the trench. The groundwater at the site is shallow and this requirement may not be met. Hydrogeological and surface assessments are required to ensure that the trenches are environmentally safe manner to dispose of the hauled sewage.

GFL Environmental Inc. decided to withdraw their application so they can conduct these assessments and will re-apply once they are completed and prior to July 1, 2023.

The ministry closed the file on July 6, 2022.

Comments received

Through the registry

0

By email

0

By mail

0
View comments submitted through the registry

Effects of consultation

No comments were received.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number

How to Appeal

Appeals are not allowed

The application was withdrawn by the applicant and no approval was issued.

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice

Original proposal

ERO number
019-3923
Ministry reference number
5241-C44SL5
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Proposal posted

Comment period

June 28, 2021 - August 12, 2021 (45 days)

Proposal details

Hauled sewage, commonly known as septage, is the waste material removed from portable toilets, sewage holding tanks and septic systems. Untreated hauled sewage from holding tanks and septic tanks may be disposed of on land in accordance with an Environmental Compliance Approval (ECA) issued under the Environmental Protection Act (EPA).

This proposal is for the issuance of an Environmental Compliance Approval for a hauled sewage disposal site.

Site details

  • application type: renewal
  • total useable area: 1 hectares
  • type of disposal: dewatering trench
  • number of trenches: # 3

Highlights of proposed approval requirements

  • prior to operating at the site, the company shall develop written procedures covering:
    • procedures for reporting to the ministry, and municipal authorities as required, in the event a spill occurs at the site
    • a list of the personnel responsible for operations at the site
  • the company shall ensure that all personnel involved in the operation of this hauled sewage disposal site are aware of the requirements of this approval and are trained in spill prevention
  • spills of a pollutant that cause or may cause an adverse effect are to be reported to the Ministry's Spills Action Centre and the company shall take appropriate remedial action to limit the impact
  • the company must ensure that no unnecessary off-site effects, such as vermin, vectors, odour, dust, litter, noise or traffic, result from the operation of this site
  • written records must be maintained in a log book that documents daily operations as well as any spills that occur and any complaints received
  • the # 3 dewatering trenches must be designed and constructed according to specified standards set out in the approval
  • the dewatering trenches must be operated in accordance with specified standards set out in the approval which include:
    • maximum volumes that can be put in a trench
    • rotating the use of the trenches
    • ensuring trenches have a rest period
    • cleaning residuals from the trenches on a regular basis
  • a closure plan shall be developed for the site and the site must be closed in accordance with the plan
  • surface or ground water monitoring conditions may be required

Other

Prior to the spreading of hauled sewage, the operator is responsible for ensuring that all necessary approvals, licences or permits that may be required from other authorities, such as the local municipality, conservation authority, Ministry of Northern Development, Mines, Natural Resources and Forestry and OMAFRA, have been acquired.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Comment

Commenting is now closed.

This consultation was open from June 28, 2021
to August 12, 2021

Connect with us

Contact