GFL Infrastructure Group Inc. - Environmental Compliance Approval (sewage)

Instrument type: Environmental Compliance Approval (sewage)

ERO number
019-4640
Ministry reference number
1045-C7TLZT
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Decision
Decision posted
Comment period
November 18, 2021 - January 2, 2022 (45 days) Closed
Last updated

This consultation was open from:
November 18, 2021
to January 2, 2022

Decision summary

GFL Infrastructure Group Inc. was not able to provide all required supporting information. Therefore, the ministry could not complete its review of their application for an Environmental Compliance Approval. The application is considered withdrawn and no approval was issued.

Location details

Site address

2045 Continental Avenue
Windsor , ON
N9E 3P2
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

GFL Infrastructure Group Inc.
100 New Park Place, Suite 500
Vaughan, ON
L4K 0H9
Canada

Decision details

GFL Infrastructure Group Inc. was not able to provide all required supporting information. Therefore, the ministry could not complete its review of their application for an Environmental Compliance Approval. The application is considered withdrawn and no approval was issued.

GFL Infrastructure Group Inc. wanted to modify their proposed stormwater management works to serve the transfer station site located at 2045 Continental Avenue in the City of Windsor.

The ministry could not complete its review of their application for an Environmental Compliance Approval without the updated stormwater management works design report.

The ministry closed the file on October 31, 2022.

 

Comments received

Through the registry

0

By email

0

By mail

0
View comments submitted through the registry

Effects of consultation

No comments were received.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number

How to Appeal

Appeals are not allowed

Since no decision was made, there is no decision to appeal.

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice

Original proposal

ERO number
019-4640
Ministry reference number
1045-C7TLZT
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Proposal posted

Comment period

November 18, 2021 - January 2, 2022 (45 days)

Proposal details

This proposal is for a new Environmental Compliance Approval (industrial sewage) for GFL Infrastructure Group (GFL). This proposal is for the collection, transmission and disposal of stormwater runoff at GFL’s waste management site located at 2045 Continental Avenue, City of Windsor, County of Essex, Ontario.

Stormwater from the site is collected in on-site catchbasins with orifice controls and directed to a proposed oil/grit separator and discharged with a direct connection to the municipal sewer system along Continental Avenue, and ultimately to the Detroit River.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Comment

Commenting is now closed.

This consultation was open from November 18, 2021
to January 2, 2022

Connect with us

Contact