Fisher Wavy Inc. - Environmental Compliance Approval (air)

Instrument type: Environmental Compliance Approval (air)

ERO number
019-4866
Ministry reference number
6752-C9RQSJ
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal
Proposal posted
Comment period
January 13, 2022 - February 27, 2022 (45 days) Closed
Last updated

This consultation was open from:

January 13, 2022
to February 27, 2022

Proposal summary

This proposal is for a new Environmental Compliance Approval (air & noise) for Fisher Wavy Inc. for the operation of a ready-mix concrete batching facility at their Dowling Pit, located in Dowling, City of Greater Sudbury, Ontario.

Location details

Site address

Lot 7, Concession 3, Dowling
Sudbury, ON
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Fisher Wavy Inc.
1 Ceasar Road
Sudbury, ON
P3E 5P3
Canada

Proposal details

This proposal is for a new Environmental Compliance Approval (air & noise) for Fisher Wavy Inc. for the operation of a ready-mix concrete batching facility at their Dowling Pit, located in Dowling, City of Greater Sudbury, Ontario.

The sources at the facility include aggregate transfer and stockpiling, a dust collector, and a diesel generator, as well as the emissions from the supporting equipment and processes at the site.

Contaminant emissions to the atmosphere include:

  • suspended particulate matter
  • calcium oxide
  • crystalline silica
  • Portland cement
  • sulphur dioxide
  • products of combustion such as nitrogen oxides

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Comment

Commenting is now closed.

The comment period was from January 13, 2022
to February 27, 2022