Update Announcement
This proposal notice has been updated on March 14, 2023 to advise the public that this application is still under active review. The ministry is reviewing the comments it has received to date. The original proposal date and comment period have not been altered.
This consultation was open from:
March 23, 2022
to May 7, 2022
Decision summary
An amendment to Environmental Compliance Approval (air & noise) No. 6656-8RVMES with Limited Operational Flexibility was issued to Evolution Mining Gold Operations Ltd., a gold mining and processing facility located in the Municipality of Red Lake, District of Kenora, Ontario.
Location details
Site address
103 East Bay Access Road
Cochenour,
ON
Canada
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
Evolution Mining Gold Operations Ltd.
15 Eric Radford Way
Balmertown,
ON
P0V 1C0
Canada
Decision details
An amendment to Environmental Compliance Approval (air & noise) No. 6656-8RVMES with Limited Operational Flexibility was issued to Evolution Mining Gold Operations Ltd., a gold mining and processing facility located in the Municipality of Red Lake, District of Kenora, Ontario.
The emission sources from the manufacturing and associated processes that exhaust to the air include:
- underground mining operations
- mine ventilation equipment
- ore handling, crushing and grinding operations
- pre processing
- tailings containment and management
- backfill plant
- propane fired comfort heating and process equipment
The amendment includes the following:
- change in the operators name
- an increase in the ore processing rate from the previously approved 1,200 tonnes per day to 1,250 tonnes per day
- renewal of the limited operational flexibility conditions
Major emissions to the air from this facility include:
- particulate matter
- metals such as manganese, arsenic, nickel and lead
- silica
- products of combustion such as nitrogen oxides
- sulphur dioxide
The approval is an Environmental Compliance Approval (air) with Limited Operational Flexibility, which is a single approval that replaces all the current Environmental Compliance Approvals for air at this facility, and includes the addition of new, or historically unapproved sources for all emissions from the facility.
The Environmental Compliance Approval (air) with Limited Operational Flexibility requires that the company demonstrates compliance on an ongoing basis with:
- Ontario Regulation 419/05
- applicable ministry guidelines for air and noise
- other performance requirements as specified in their conditions
It permits modifications such as process changes, de-bottlenecking or addition of new equipment subject to limits on operational flexibility that include a production limit for the facility specified in the approval.
The limited operational flexibility conditions have a 10 years expiry date. The company is required to make an application for amendment at that time to renew these conditions.
Effects of consultation
No comments were received.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
How to Appeal
This instrument decision can be appealed. You have 15 days from February 29, 2024 to begin the appeal process.
Carefully review the information below to learn more about the appeal process.
How to appealClick to Expand Accordion
Start the process to appeal
If you’re an Ontario resident, you can start the process to appeal this instrument decision.
First, you’ll need to seek leave (i.e. get permission) from the relevant appellate body to appeal the decision.
If the appellate body grants leave, the appeal itself will follow.
Seek leave to appeal
To seek leave to appeal, you need to do these three things:
- prepare your application
- provide notice to the minister
- mail your application to three parties
1. Prepare your application
You’ll need to prepare an application. You may wish to include the following things in your application:
- A document that includes:
- your name, phone number, fax number (if any), and/or email address
- the ERO number and ministry reference number (located on this page)
- a statement about whether you are a resident in Ontario
- your interest in the decision, and any facts you want taken into account in deciding whether you have an interest in the decision
- the parts of the instrument that you’re challenging
- whether the decision could result in significant harm to the environment
- the reason(s) why you believe that no reasonable person – having regard to the relevant law and to any government policies developed to guide decisions of that kind – could have made the decision
- the grounds (facts) you’ll be using to appeal
- the outcome you’d like to see
- A copy of the instrument (approval, permit, order) that you you are seeking leave to appeal. You’ll find this in the decision notice on the Environmental Registry
- Copies of all supporting documents, facts and evidence that you’ll be using to appeal
What is considered
The appeal body will consider the following two questions in deciding whether to grant you leave to appeal:
- is there is good reason to believe that no reasonable person, with respect to the relevant law and to any government policies developed to guide decisions of that kind, could have made the decision?
- could the decision you wish to appeal result in significant harm to the environment?
2. Provide your notice
You’ll need to provide notice to the Minister of the Environment, Conservation and Parks that you’re seeking leave to appeal.
In your notice, please include a brief description of the:
- decision that you wish to appeal
- grounds for granting leave to appeal
You can provide notice by email at minister.mecp@ontario.ca or by mail at:
College Park 5th Floor, 777 Bay St.
Toronto, ON
M7A 2J3
3. Mail your application
You’ll need to mail your application that you prepared in step #1 to each of these three parties:
- appellate body
- issuing authority (the ministry official who issued the instrument)
- proponent (the company or individual to whom the instrument was issued)
Evolution Mining Gold Operations Ltd.
15 Eric Radford Way
Balmertown,
ON
P0V 1C0
Canada
Registrar, Ontario Land Tribunal
655 Bay Street, Suite 1500
Toronto, Ontario
M5G 1E5
(416) 212-6349
(866) 448-2248
OLT.Registrar@ontario.ca
Include the following:
This is not legal advice. Please refer to the Environmental Bill of Rights for exact legal requirements. Consult a lawyer if you need help with the appeal process.
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Original proposal
Proposal details
This proposal is for an amendment to the Limited Operational Flexibility for Environmental Compliance Approval (air & noise) No. 6656-8RVMES for Evolution Mining Gold Operations Ltd., a gold mining facility located in the Municipality of Red Lake, District of Kenora, Ontario.
The emission sources from the manufacturing and associated processes that exhaust to the air include:
- aggregate transfer and storage
- ore milling
- rock crushing and screening
- reagent storage
- dust collectors
- smelting
- cyanide destruction
- ammonia displacement
- emergency diesel generators
- a tailings management facility
- maintenance welding
- any other equipment and ancillary and support processes and activities
The amendment includes:
- increasing the facility production limit
- renewing the limited operational flexibility
Emissions to the air from this facility include:
- particulate matter
- silica
- arsenic
- nickel
- lead
- benzene
- products of combustion such as nitrogen oxides
The Environmental Compliance Approval with Limited Operational Flexibility (air), when issued, permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air).
The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
Comment
Commenting is now closed.
This consultation was open from March 23, 2022
to May 7, 2022
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Comments received
Through the registry
0By email
0By mail
0