Roseson Distributors Inc. - Environmental Compliance Approval (sewage)

Instrument type: Environmental Compliance Approval (sewage)

ERO number
019-5561
Ministry reference number
9399-CD6N65
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal
Proposal posted
Comment period
June 7, 2022 - July 22, 2022 (45 days) Closed
Last updated

This consultation was open from:

June 7, 2022
to July 22, 2022

Proposal summary

This proposal is for a new Environmental Compliance Approval (industrial sewage) for Roseson Distributors Inc., for sewage works serving a proposed fuel pump cardlock system, located at 5589 Road 38 in the Township of South Frontenac, Ontario.

Location details

Site address

5589 Road 38
South Frontenac, ON
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Roseson Distributors Inc.
4026 Old Highway 2 East
Belleville, ON
K8N 4Z4
Canada

Proposal details

This proposal is for a new Environmental Compliance Approval (industrial sewage) for Roseson Distributors Inc., for sewage works serving a proposed fuel pump cardlock system, located at 5589 Road 38 in the Township of South Frontenac, Ontario.

Stormwater from the new overhead canopy as well as the fuel pumps and concrete slab will be collected in three catchbasins and directed into a proposed oil/water separator.

The treated effluent will discharge into a roadside ditch, located at the southwest corner of the property.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number

Comment

Commenting is now closed.

The comment period was from June 7, 2022
to July 22, 2022

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice