Lehigh Hanson Materials Limited - Environmental Compliance Approval (air)

Instrument type: Environmental Compliance Approval (air)

ERO number
019-5811
Ministry reference number
1000159737
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal Updated
Proposal posted
Comment period
August 4, 2022 - September 18, 2022 (45 days) Closed
Last updated

Update Announcement

This proposal notice has been updated on February 28, 2024 to advise the public that this file/application is still under active review. The ministry is reviewing the comments it has received to date. The original proposal date and comment period have not been altered.

This consultation was open from:

August 4, 2022
to September 18, 2022

Proposal summary

This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air) for Lehigh Hanson Materials Limited, a ready-mix concrete manufacturing facility located in the Township of North Dumfries, Ontario.

Location details

Site address

380 Waydom Drive
North Dumfries, ON
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Lehigh Hanson Materials Limited
2787 Sheffield Road
Ottawa, ON
K1B 3V8
Canada

Proposal details

This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air) which replaces all the current Environmental Compliance Approvals for air at this facility and includes the addition of new or historically unapproved sources for all emissions from Lehigh Hanson Materials Limited, a ready-mix concrete manufacturing facility located in the Township of North Dumfries, Ontario.

The proposal includes all sources at the facility, including process and non-process sources of combustion such as hot water and steam boilers, emission control equipment such as baghouses, materials storage, and other ancillary operations.

Emissions to the air from this facility include:

  • nitrogen oxides
  • calcium oxide
  • Portland cement
  • suspended particulate matter

The Environmental Compliance Approval with Limited Operational Flexibility (air), when issued permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air). The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number

Comment

Commenting is now closed.

The comment period was from August 4, 2022
to September 18, 2022

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice