Siltech Corporation - Environmental Compliance Approval (air)

Instrument type: Environmental Compliance Approval (air)

ERO number
019-5965
Ministry reference number
2683-CY4RRL
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal
Proposal posted
Comment period
December 8, 2023 - January 22, 2024 (45 days) Closed
Last updated

This consultation was open from:

December 8, 2023
to January 22, 2024

Proposal summary

This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air & noise) for all emissions from Siltech  Corporation, a special chemical manufacturing facility, located at 1700 Pettit Road, Fort Erie, Ontario.

Location details

Site address

1700 Pettit Road
Fort Erie, ON
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Siltech Corporation
3625 Wolfedale Road
Mississauga, ON
L4A 5M4
Canada

Proposal details

This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air & noise) which replaces all the current Environmental Compliance Approvals for Air at this facility and includes the addition of new or historically unapproved sources for all emissions from Siltech Corporation, a special chemical manufacturing facility, located at 1700 Pettit Road, Fort Erie, Ontario.

The application includes all sources at the facility, including material handling, 10 storage tanks, one cooling towers, 6 laboratory fume hoods, one steam boiler, and one hot oil heater, batch mixing, decanting, and stripping with emissions controlled by a caustic scrubbing unit.

The facility operates with a Facility Production Limit of 600, 000 kilograms per day of product. Emissions to the air from this facility include:

  • vinyl cyclohexene monoxide,
  • acetic anhydride,
  • black copolymer of dimethylsiloxane,
  • silicone solymer,
  • S&S_ethoxylated,
  • poly(dimethylsiloxane),
  • allyl glycidyl ether,
  • silicone copolymer epoxide,
  • 1,1,3,3-Tetramethyldisiloxane,
  • isopropyl alcohol,
  • nitrogen oxides and other products of combustion.

The Environmental Compliance Approval with Limited Operational Flexibility (air), when issued permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air). The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada

Office phone number

Comment

Commenting is now closed.

The comment period was from December 8, 2023
to January 22, 2024

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice