This consultation was open from:
November 15, 2022
to December 30, 2022
Decision summary
Certificate of Property Use No. 6454-CGJJCS was issued to Chayell Palm Canada Ltd. on January 16, 2023 with no changes as part of the development plans for the property.
Location details
Site address
220 Bradford Street
Barrie,
ON
Canada
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
Chayell Palm Canada Ltd.
7815 Kent Blvd.
Brockville,
ON
K6V6N7
Canada
Decision details
The Certificate of Property Use requires the owner to ensure that the following key measures are undertaken:
- restrictions regarding building construction on, and the use of, the property
- implementation of vapour mitigation systems
- implementation of indoor air/sub-slab monitoring requirements
- implementation of ground water monitoring requirements
- implementation of a ground water management plan
- implementation of a health and safety plan
- reporting requirements
A Section 197 Order is included and requires that a certificate be registered on the property title in accordance with section 197 of the Act and that before dealing with the property in any way, a copy of the Certificate of Property Use must be given to any person who will acquire an interest in the property.
A copy of the final Certificate of Property Use, including the Section 197 Order, is provided as a link under the Supporting Materials section of this Notice.
Effects of consultation
As a result of the public consultation on the proposal, the ministry received two sets of public comments/concerns. A summary of the concerns and how they were considered by the director are as noted below.
Many of the comments did not suggest changes to the Certificate of Property Use (CPU), but were questions regarding concerns about the potential for impacted soils and ground water to adversely impact on and off-site receptors.
No changes to the CPU were made in response to the public comments.
In response to the comments, the following should be noted:
The risk assessment that was accepted by the ministry on June 13, 2022 assessed the potential for on and off-site adverse effects as part of the human health and ecological risk assessment components. The results of this assessment indicated that no on-site and no off-site adverse effects are anticipated due to the site conditions and proposed risk management measures. Also, it should be noted that no impacted soils were identified at the site as defined in the CPU.
In addition, it should be noted that an exceedance of the ministry’s generic site condition standards as outlined in the document entitled “Soil, Ground Water and Sediment Standards for use under Part XV.1 of the Environmental Protection Act” dated July 1, 2011 does not necessarily mean that the concentrations are causing or likely to be causing an adverse effect.
As outlined in the ministry accepted Risk Assessment and the CPU, the proposed use is to include a mixed use of residential and commercial property uses. In order to allow for the change in use of the site from former commercial/industrial uses to the more sensitive use the owners must file a record of site condition for the property on the Ministry’s Brownfields Environmental Site Registry as per section 168.3 of the Environmental Protection Act. The filing of a record of site condition provides certain protections for the owner from the ministry issuing orders under section 7, 8, 12, 17, 18, 97, 157, or 157.1 of the Environmental Protection Act (see section 168.7 of the Environmental Protection Act for further details).
In addition, clarifications on specific Items under the draft CPU that related to the public comments are as follows:
The requirements under Item 4.2.4 “Future Site Development” are meant to address future situations during development in which unanticipated impacts may be identified during construction activities that may not have been addressed as part of the risk assessment. The requirements under this Item ensures that any unanticipated impacts identified are addressed in keeping with the original assumptions and requirements that were used during the risk assessment process.
Regarding Item 4.2.6 of the CPU, a copy of the Soil Vapour Intrusion Mitigation System design will need to be provided to the City in order to obtain a building permit. The requirements under the Certificate of Property Use are requirements that also need to be accounted for as part of the building permit process. To help facilitate this, a copy of the final CPU is provided to both the City Clerk and the Chief Building Official at the time of issuance.
The submission of reports to the City regarding inspections and monitoring programs is not included in CPUs but could be included as part of the building permit(s) and/or site plan agreements to be issued by the City.
The requirements under Item 4.2.9 “Ground Water Monitoring Program” outlines the on-going ground water monitoring program to be completed at the Site to ensure that any changes to the ground water regime, including Contaminant of Concern concentrations are identified and addressed, if needed, in particular during development.
Item 4.2.9.4 outlines the requirements to be implemented as part of the on-going ground water monitoring program if the potential for off-Site migration of impacted ground water that may be causing or likely to cause an off-site adverse effect is identified, including notification to the Director. Requirements to notify the City are not included in the CPU, however, as noted above, this requirement could be included as part of the building permit(s) and/or site plan agreements to be issued by the City. If the ministry is notified of an off-site adverse effect, the ministry will as part of its normal practices consult with the City and any affected parties.
Item 4.2.9.5 requires that if any ground water monitoring well required under this monitoring program is destroyed or damaged, that it will be repaired or replaced to ensure the continuing integrity of the monitoring program.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
54 Cedar Pointe Drive
Unit 1201
Barrie,
ON
L4N 5R7
Canada
How to Appeal
This instrument decision can be appealed. You have 15 days from January 17, 2023 to begin the appeal process.
Carefully review the information below to learn more about the appeal process.
How to appealClick to Expand Accordion
Start the process to appeal
If you’re an Ontario resident, you can start the process to appeal this instrument decision.
First, you’ll need to seek leave (i.e. get permission) from the relevant appellate body to appeal the decision.
If the appellate body grants leave, the appeal itself will follow.
Seek leave to appeal
To seek leave to appeal, you need to do these three things:
- prepare your application
- provide notice to the minister
- mail your application to three parties
1. Prepare your application
You’ll need to prepare an application. You may wish to include the following things in your application:
- A document that includes:
- your name, phone number, fax number (if any), and/or email address
- the ERO number and ministry reference number (located on this page)
- a statement about whether you are a resident in Ontario
- your interest in the decision, and any facts you want taken into account in deciding whether you have an interest in the decision
- the parts of the instrument that you’re challenging
- whether the decision could result in significant harm to the environment
- the reason(s) why you believe that no reasonable person – having regard to the relevant law and to any government policies developed to guide decisions of that kind – could have made the decision
- the grounds (facts) you’ll be using to appeal
- the outcome you’d like to see
- A copy of the instrument (approval, permit, order) that you you are seeking leave to appeal. You’ll find this in the decision notice on the Environmental Registry
- Copies of all supporting documents, facts and evidence that you’ll be using to appeal
What is considered
The appeal body will consider the following two questions in deciding whether to grant you leave to appeal:
- is there is good reason to believe that no reasonable person, with respect to the relevant law and to any government policies developed to guide decisions of that kind, could have made the decision?
- could the decision you wish to appeal result in significant harm to the environment?
2. Provide your notice
You’ll need to provide notice to the Minister of the Environment, Conservation and Parks that you’re seeking leave to appeal.
In your notice, please include a brief description of the:
- decision that you wish to appeal
- grounds for granting leave to appeal
You can provide notice by email at minister.mecp@ontario.ca or by mail at:
College Park 5th Floor, 777 Bay St.
Toronto, ON
M7A 2J3
3. Mail your application
You’ll need to mail your application that you prepared in step #1 to each of these three parties:
- appellate body
- issuing authority (the ministry official who issued the instrument)
- proponent (the company or individual to whom the instrument was issued)
Chayell Palm Canada Ltd.
7815 Kent Blvd.
Brockville,
ON
K6V6N7
Canada
Registrar, Ontario Land Tribunal
655 Bay Street, Suite 1500
Toronto, Ontario
M5G 1E5
(416) 212-6349
(866) 448-2248
OLT.Registrar@ontario.ca
Include the following:
This is not legal advice. Please refer to the Environmental Bill of Rights for exact legal requirements. Consult a lawyer if you need help with the appeal process.
Connect with us
Contact
Chris Hyde
54 Cedar Pointe Dr
Unit 1201
Barrie,
ON
L4N 5R7
Canada
Original proposal
Proposal details
A risk assessment was undertaken for this property for the following reasons:
- to establish the risks that the contaminants identified in the risk assessment may pose to future users
- to identify appropriate risk management measures to be implemented to ensure that the property is suitable for the intended mixed use of "Residential" and "Commercial" Property Uses as defined by Ontario Regulation 153/04(the "Regulation"), as amended, made under the Environmental Protection Act(the "Act")
The ministry has accepted the risk assessment prepared for the owner as part of the development plans for the property.
Based on the documents provided to the ministry as part of the risk assessment reports, the reviewers confirmed that the risk assessment has been conducted in accordance with the Act, the Regulation, and the associated guidance documents.
The director provided the proponent with written Notice of the Director’s Decision to accept the risk assessment relating to the property in accordance with section 168.5 of the Act on June 13, 2022.
The director is considering issuing a Certificate of Property Use (CPU) in relation to the property. The CPU (Certificate of Property Use) incorporates the risk management measures proposed in the risk assessment and any additional conditions proposed by the director. A Section 197 Order is included and requires that a certificate be registered on the property title in accordance with section 197 of the Act and that before dealing with the property in anyway, a copy of the CPU (Certificate of Property Use) must be given to any person who will acquire an interest in the property.
The proposed risk management measures include:
- restrictions regarding building construction on, and the use of, the property
- implementation of vapour mitigation systems
- indoor air/sub-slab monitoring requirements
- ground water monitoring requirements
- implementing a ground water management plan
- a health and safety plan
- reporting requirements
The proposed CPU (Certificate of Property Use) No.(Number) 6454-CGJJCS, including the Section 197 Order, is provided as a link under the Supporting Materials section of this notice.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
54 Cedar Pointe Drive
Unit 1201
Barrie,
ON
L4N 5R7
Canada
Comment
Commenting is now closed.
This consultation was open from November 15, 2022
to December 30, 2022
Connect with us
Contact
Chris Hyde
54 Cedar Pointe Dr
Unit 1201
Barrie,
ON
L4N 5R7
Canada
Comments received
Through the registry
2By email
0By mail
0