Ridge (Chatham) Holdings G.P. Inc., as a general partner for and on behalf of Ridge (Chatham) Holdings, L.P. - Environmental Compliance Approval (waste)

Instrument type: Environmental Compliance Approval (waste)

ERO number
019-6309
Ministry reference number
3738-CKMHEY
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Decision
Decision posted
Comment period
November 21, 2022 - January 5, 2023 (45 days) Closed
Last updated

This consultation was open from:
November 21, 2022
to January 5, 2023

Decision summary

We have issued an amended ECA to Ridge (Chatham) Holdings G.P. Inc., as a general partner for and on behalf of Ridge (Chatham) Holdings, L.P.,for a landfill site used for landfilling, wood waste grinding, public waste drop-off, public recycling area, and source-separated C & D waste processing located at 20262 Erieau Road, Chatham-Kent, Ontario

Location details

Site address

20262 Erieau Road
Lot 13-16, Concession 4
Chatham-Kent , ON
N0P 1A0
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Ridge (Chatham) Holdings G.P. Inc., as a general partner for and on behalf of Ridge (Chatham) Holdings, L.P.
20262 Erieau Road
Chatham-Kent, ON
N0P 1A0
Canada

Decision details

We have issued an amended Environmental Compliance Approval No. A021601 to Ridge (Chatham) Holdings G.P. Inc., as a general partner for and on behalf of Ridge (Chatham) Holdings, L.P., for a landfill site used for landfilling, wood waste grinding, public waste drop-off, public recycling area, and source-separated construction and demolition waste processing located at 20262 Erieau Road, Chatham-Kent, Ontario.

The approval is to add a renewable natural gas facility which will convert landfill gas into pipeline quality natural gas equivalent by removing specific gases and water from the landfill gas.

At capacity, the renewable natural gas facility will divert 6,000 standard cubic feet per minute (scfm), or 10,200 standard cubic metres per hour (sm3/h) of landfill gas, to produce approximately 3,000 scfm or 5,100 sm3/h of renewable natural gas. The renewable natural gas will be accepted and directed into Enbridge Gas Inc. natural gas pipeline network.

The renewable natural gas facility will operate 24 hours a day with the exception of scheduled maintenance activities and unscheduled events such as power outages.

Comments received

Through the registry

0

By email

0

By mail

0
View comments submitted through the registry

Effects of consultation

No comments were received.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Windsor Area Office
Address

4510 Rhodes Drive
Unit 620
Windsor, ON
N8W 5K5
Canada

Office phone number
Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number

How to Appeal

This instrument decision can be appealed. You have 15 days from June 14, 2023 to begin the appeal process.

Carefully review the information below to learn more about the appeal process.

How to appealClick to Expand Accordion

Start the process to appeal

If you’re an Ontario resident, you can start the process to appeal this instrument decision.

First, you’ll need to seek leave (i.e. get permission) from the relevant appellate body to appeal the decision.

If the appellate body grants leave, the appeal itself will follow.

Seek leave to appeal

To seek leave to appeal, you need to do these three things:

  1. prepare your application
  2. provide notice to the minister
  3. mail your application to three parties

1. Prepare your application

You’ll need to prepare an application. You may wish to include the following things in your application:

  1. A document that includes:
    • your name, phone number, fax number (if any), and/or email address
    • the ERO number and ministry reference number (located on this page)
    • a statement about whether you are a resident in Ontario
    • your interest in the decision, and any facts you want taken into account in deciding whether you have an interest in the decision
    • the parts of the instrument that you’re challenging
    • whether the decision could result in significant harm to the environment
    • the reason(s) why you believe that no reasonable person – having regard to the relevant law and to any government policies developed to guide decisions of that kind – could have made the decision
    • the grounds (facts) you’ll be using to appeal
    • the outcome you’d like to see
  2. A copy of the instrument (approval, permit, order) that you you are seeking leave to appeal. You’ll find this in the decision notice on the Environmental Registry
  3. Copies of all supporting documents, facts and evidence that you’ll be using to appeal
What is considered

The appeal body will consider the following two questions in deciding whether to grant you leave to appeal:

  1. is there is good reason to believe that no reasonable person, with respect to the relevant law and to any government policies developed to guide decisions of that kind, could have made the decision?
  2. could the decision you wish to appeal result in significant harm to the environment?

2. Provide your notice

You’ll need to provide notice to the Minister of the Environment, Conservation and Parks that you’re seeking leave to appeal.

In your notice, please include a brief description of the:

  • decision that you wish to appeal
  • grounds for granting leave to appeal

You can provide notice by email at minister.mecp@ontario.ca or by mail at:

College Park 5th Floor, 777 Bay St.
Toronto, ON
M7A 2J3

3. Mail your application

You’ll need to mail your application that you prepared in step #1 to each of these three parties:

  • appellate body
  • issuing authority (the ministry official who issued the instrument)
  • proponent (the company or individual to whom the instrument was issued)

Issuing authority
Mohsen Keyvani
Manager

Environmental Assessment and Permissions Branch
135 St Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

416-432-7253

Proponent(s)

Ridge (Chatham) Holdings G.P. Inc., as a general partner for and on behalf of Ridge (Chatham) Holdings, L.P.
20262 Erieau Road
Chatham-Kent, ON
N0P 1A0
Canada


Appellate body

Registrar, Ontario Land Tribunal
655 Bay Street, Suite 1500
Toronto, Ontario
M5G 1E5
(416) 212-6349
(866) 448-2248
OLT.Registrar@ontario.ca

About the Ontario Land Tribunal


Include the following:

ERO number
019-6309
Ministry reference number
3738-CKMHEY

This is not legal advice. Please refer to the Environmental Bill of Rights for exact legal requirements. Consult a lawyer if you need help with the appeal process.

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice

Original proposal

ERO number
019-6309
Ministry reference number
3738-CKMHEY
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Proposal posted

Comment period

November 21, 2022 - January 5, 2023 (45 days)

Proposal details

This proposal is to amend Environmental Compliance Approval (waste disposal site) No. A021601, issued to Ridge (Chatham) Holdings G.P. Inc., as a general partner for and on behalf of Ridge (Chatham) Holdings, L.P., for a landfill facility used for a landfilling area, wood waste grinding, public waste drop-off, public recycling area, and source-separated construction and demolition waste processing located at 20262 Erieau Road, Chatham-Kent, Ontario.

The landfill facility is seeking to add a renewable natural gas facility which will convert landfill gas into pipeline quality natural gas equivalent by removing specific gases and water from the landfill gas.

At capacity, the renewable natural gas facility will divert 6,000 standard cubic feet per minute (scfm) or 10,200 standard cubic metres per hour (sm3/h) of landfill gas to produce approximately 3,000 scfm or 5,100 sm3/h of renewable natural gas. The renewable natural gas will be accepted and directed into Enbridge Gas Inc. natural gas pipeline network.

The renewable natural gas facility will operate 24 hours a day with the exception of scheduled maintenance activities and unscheduled events such as power outages.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number

Comment

Commenting is now closed.

This consultation was open from November 21, 2022
to January 5, 2023

Connect with us

Contact