Update Announcement
This proposal notice has been updated on February 28, 2024 to advise the public that this file/application is still under active review. The ministry is reviewing the comments it has received to date. The original proposal date and comment period have not been altered.”
This consultation was open from:
December 23, 2022
to February 6, 2023
Proposal summary
Amendment to the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 0073-BHGQHC3 for Lehigh Hanson Materials Limited), a cement manufacturing facility located in the City of Picton, Ontario.
Location details
Site address
1370 Highway 49
Picton,
ON
Canada
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
Lehigh Hanson Materials Limited/Mateériaux Lehigh Hanson Limitée
1370 Highway 49
Box 620
Picton,
ON
K0K 2T0
Canada
Proposal details
This proposal is for an amendment to Environmental Compliance Approval (air & noise) No. 0073-BHGQHC3 with Limited Operational Flexibility for Lehigh Hanson Materials Limited, a cement manufacturing facility located at 1370 Highway 49 in the Picton, Ontario.
The emission sources from the manufacturing and associated processes that discharge to the air include:
- quarry operations
- clinker production
- cement production
- ancillary operations including, kilns, silos, baghouses and slag dryer
The amendment includes the use of Alternative Low Carbon Fuels (ALCF) and installation of new conveyance and storage equipment.
Emissions to the air from this facility include:
- crystalline silica
- iron
- nitrogen oxides
- hydrogen chloride
- particulate matter
- benzene
- nickel
- cobalt
The Environmental Compliance Approval with Limited Operational Flexibility (air), when issued, permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air). The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
135 St. Clair Avenue West
Floor 1
Toronto,
ON
M4V 1P5
Canada
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Comment
Commenting is now closed.
The comment period was from December 23, 2022
to February 6, 2023