This consultation was open from:
January 20, 2023
to February 19, 2023
Proposal summary
This proposal is for a Permit to Take Water for snowmaking and water supply purposes.
Location details
Site address
1800 Loch Lomond Road
Thunder Bay,
ON
Canada
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
Ski Co Development Inc.
1800 Loch Lomond Road
Thunder Bay,
ON
P7J 1E9
Canada
Proposal details
This proposal is for a Permit to Take Water for snowmaking and water supply purposes. Water will be taken from two ponds. Details of the water taking are as follows:
Permit type – Renewal:
Source name: Double Pond
- purpose of taking: snowmaking
- maximum rate per minute (litres per minute): 5,678
- maximum number of hours of taking per day: 24
- maximum volume of taking per day: 8,176,320 litres
- maximum number of days of taking in a year: 60
- earliest calendar date of taking (mm/dd): 11/01
- latest calendar date of taking (mm/dd): 01/31
- length of taking: 10 years
Source name: Holding Pond
- purpose of taking: snowmaking
- maximum rate per minute (litres per minute): 3,785
- maximum number of hours of taking per day: 24
- maximum volume of taking per day: 5,450,400 litres
- maximum number of days of taking in a year: 120
- earliest calendar date of taking (mm/dd): 11/01
- latest calendar date of taking (mm/dd): 02/28
- length of taking: 10 years
Source name: Holding Pond
- purpose of taking: grey water
- maximum rate per minute (litres per minute): 84
- maximum number of hours of taking per day: 24
- maximum volume of taking per day: 120,960 litres
- maximum number of days of taking in a year: 365
- earliest calendar date of taking (mm/dd): 01/01
- latest calendar date of taking (mm/dd): 12/31
- length of taking: 10 years
There are 3 categories of a Permit to Take Water:
- Category 1: water takings are anticipated to have a lower risk of causing an unacceptable environmental impact/interference
- Category 2: water takings are anticipated to having a higher potential of causing unacceptable environmental impact or interference
- Category 3: water takings are anticipated to have the highest potential of causing unacceptable environmental impactor interference
The proposed water taking qualifies as a Category 1 permit.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
135 St. Clair Avenue West
Floor 1
Toronto,
ON
M4V 1P5
Canada
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Comment
Commenting is now closed.
The comment period was from January 20, 2023
to February 19, 2023