This consultation was open from:
April 13, 2023
to May 28, 2023
Decision summary
A new Environmental Compliance Approval was granted to Toro GP Inc., as General Partner for and on behalf of Toro Limited Partnership, for stormwater management works serving a distribution centre located at 640 College Street East, in the City of Belleville.
Location details
Site address
640 College Street East
Belleville,
ON
Canada
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
Toro GP Inc. as General Partner for and on behalf of Toro Limited Partnership
2680 Skymark Avenue
Suite 800
Mississauga,
ON
L4W 5L6
Canada
Decision details
A new Environmental Compliance Approval (industrial sewage) was granted to Toro GP Inc., as General Partner for and on behalf of Toro Limited Partnership, for stormwater management works serving a distribution centre consisting of a single storey building, parking lots, driveways and landscaped areas, located at 640 College Street East, in the City of Belleville.
The approved stormwater management system serving 25.34 ha of eastern portion catchment area consists of:
- a new wet pond discharging to Bell Creek via an outlet structure and an outlet ditch
- a water balance and infiltration component including pumping system and infiltration chambers for groundwater recharging
The approved stormwater management system serving 12.7 ha of western portion catchment area includes:
- storm sewers that connect to municipal storm sewer system on College Street East
- new dry pond to control stormwater runoff from a 5.97 ha drainage area to the capacity of the downstream municipal storm sewers
Effects of consultation
No comments were received.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
345 College St E
Belleville,
ON
K8N 5S7
Canada
How to Appeal
This instrument decision can be appealed. You have 15 days from December 5, 2023 to begin the appeal process.
Carefully review the information below to learn more about the appeal process.
How to appealClick to Expand Accordion
Start the process to appeal
If you’re an Ontario resident, you can start the process to appeal this instrument decision.
First, you’ll need to seek leave (i.e. get permission) from the relevant appellate body to appeal the decision.
If the appellate body grants leave, the appeal itself will follow.
Seek leave to appeal
To seek leave to appeal, you need to do these three things:
- prepare your application
- provide notice to the minister
- mail your application to three parties
1. Prepare your application
You’ll need to prepare an application. You may wish to include the following things in your application:
- A document that includes:
- your name, phone number, fax number (if any), and/or email address
- the ERO number and ministry reference number (located on this page)
- a statement about whether you are a resident in Ontario
- your interest in the decision, and any facts you want taken into account in deciding whether you have an interest in the decision
- the parts of the instrument that you’re challenging
- whether the decision could result in significant harm to the environment
- the reason(s) why you believe that no reasonable person – having regard to the relevant law and to any government policies developed to guide decisions of that kind – could have made the decision
- the grounds (facts) you’ll be using to appeal
- the outcome you’d like to see
- A copy of the instrument (approval, permit, order) that you you are seeking leave to appeal. You’ll find this in the decision notice on the Environmental Registry
- Copies of all supporting documents, facts and evidence that you’ll be using to appeal
What is considered
The appeal body will consider the following two questions in deciding whether to grant you leave to appeal:
- is there is good reason to believe that no reasonable person, with respect to the relevant law and to any government policies developed to guide decisions of that kind, could have made the decision?
- could the decision you wish to appeal result in significant harm to the environment?
2. Provide your notice
You’ll need to provide notice to the Minister of the Environment, Conservation and Parks that you’re seeking leave to appeal.
In your notice, please include a brief description of the:
- decision that you wish to appeal
- grounds for granting leave to appeal
You can provide notice by email at minister.mecp@ontario.ca or by mail at:
College Park 5th Floor, 777 Bay St.
Toronto, ON
M7A 2J3
3. Mail your application
You’ll need to mail your application that you prepared in step #1 to each of these three parties:
- appellate body
- issuing authority (the ministry official who issued the instrument)
- proponent (the company or individual to whom the instrument was issued)
Toro GP Inc. as General Partner for and on behalf of Toro Limited Partnership
2680 Skymark Avenue
Suite 800
Mississauga,
ON
L4W 5L6
Canada
Registrar, Ontario Land Tribunal
655 Bay Street, Suite 1500
Toronto, Ontario
M5G 1E5
(416) 212-6349
(866) 448-2248
OLT.Registrar@ontario.ca
Include the following:
This is not legal advice. Please refer to the Environmental Bill of Rights for exact legal requirements. Consult a lawyer if you need help with the appeal process.
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Original proposal
Proposal details
This proposal is for a new Environmental Compliance Approval (industrial sewage) to be issued to Toro GP Inc. as General Partner for and on behalf of Toro Limited Partnership for the proposed stormwater management system as part of the proposed Toro Distribution Centre located at 640 College Street East, in the City of Belleville, Ontario.
The proposed wet pond on the east and the dry pond on the West are designed for quality and quantity control. The stormwater management system collects, conveys, treats and discharges stormwater runoff from the lands via an outlet control structure and outlet ditch for a proposed wet pond on the eastern portion of the site; and for the western portion of the site via a storm sewer system on College Street East outletting to an existing stormwater management facility to the south prior to discharge into Bell Creek, within the Bay of Quinte (Moira River) Watershed.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
135 St. Clair Avenue West
Floor 1
Toronto,
ON
M4V 1P5
Canada
Comment
Commenting is now closed.
This consultation was open from April 13, 2023
to May 28, 2023
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Comments received
Through the registry
0By email
0By mail
0