GATLING EXPLORATION INC. - Permit to take water

Instrument type: Permit to take water

ERO number
019-6958
Ministry reference number
1000221870
Notice type
Instrument
Act
Ontario Water Resources Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Decision
Decision posted
Comment period
April 21, 2023 - May 21, 2023 (30 days) Closed
Last updated

This consultation was open from:
April 21, 2023
to May 21, 2023

Decision summary

This decision is for a new Permit to Take Water for Gatling Exploration Inc. for mining, quarrying and gas extraction purposes. Water will be taken from 18 water courses and 12 lakes.

Location details

Site address

13600 66 Highway
Larder Lake, ON
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

GATLING EXPLORATION INC.
800 West Pender Street
Unit 770
Vancouver, BC
V6C 2V6
Canada

Decision details

This decision is for a new Permit to Take Water for Gatling Exploration Inc. for mining, quarrying and gas extraction purposes. Water will be taken from eighteen 18 water courses and twelve 12 lakes. Permit to Take Water No. P-300-1221871218 was issued on September 29, 2023 for a period of 10 years.

Permits to Take Water include conditions that require the permit holder to:

  • collect and record the daily amount of water taken
  • comply with the terms and conditions in the permit
  • immediately report complaints or interference to the ministry
  • report water takings each year to the ministry

Details of the water taking is as follows:

Permit type: New

Source name: Malone Lake

  • purpose: mining, quarrying, and oil and gas extraction
  • maximum rate per minute (litres): 133
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 192,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • period of taking: 10 years

Source name: Crosby Lake

  • purpose: mining, quarrying, and oil and gas extraction
  • maximum rate per minute (litres): 133
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 192,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • period of taking: 10 years

Source name: Monocle Lake

  • purpose: mining, quarrying, and oil and gas extraction
  • maximum rate per minute (litres): 133
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 192,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • period of taking: 10 years

Source name: Bear Lake

  • purpose: mining, quarrying, and oil and gas extraction
  • maximum rate per minute (litres): 133
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 192,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • period of taking: 10 years

Source name: Chief Tonene Lake

  • purpose: mining, quarrying, and oil and gas extraction
  • maximum rate per minute (litres): 133
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 192,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • period of taking: 10 years

Source name: Diamond Lake

  • purpose: mining, quarrying, and oil and gas extraction
  • maximum rate per minute (litres): 133
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 192,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • period of taking: 10 years

Source name: Marjorie Lake (lac Marjorie)

  • purpose: mining, quarrying, and oil and gas extraction
  • maximum rate per minute (litres): 133
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 192,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • period of taking: 10 years

Source name: Binney Lake

  • purpose: mining, quarrying, and oil and gas extraction
  • maximum rate per minute (litres): 133
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 192,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • period of taking: 10 years

Source name: Moosehead Lake

  • purpose: mining, quarrying, and oil and gas extraction
  • maximum rate per minute (Litres): 133
  • maximum number of hours of taking per day: 24
  • maximum volume per day (Litres): 192,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • period of taking: 10 years

Source name: Spectacle Lakes

  • purpose: mining, quarrying, and oil and gas extraction
  • maximum rate per minute (litres): 133
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 192,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • period of taking: 10 years

Source name: Killarney Lake (lac des Morts)

  • purpose: mining, quarrying, and oil and gas extraction
  • maximum rate per minute (litres): 133
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 192,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • period of taking: 10 years

Source name: Larder Lake

  • purpose: mining, quarrying, and oil and gas extraction
  • maximum rate per minute (litres): 133
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 192,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • period of taking: 10 years

Source name: Watercourse A

  • purpose: mining, quarrying, and oil and gas extraction
  • paximum rate per minute (litres): 74
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 48,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • period of taking: 10 years

Source name: Watercourse B

  • purpose: mining, quarrying, and oil and gas extraction
  • maximum rate per minute (litres): 74
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 48,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • period of taking: 10 years

Source name: Watercourse C

  • purpose: mining, quarrying, and oil and gas extraction
  • maximum rate per minute (litres): 74
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 48,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • period of taking: 10 years

Source name: Watercourse D

  • purpose: mining, quarrying, and oil and gas extraction
  • maximum rate per minute (litres): 74
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 48,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • period of taking: 10 years

Source name: Watercourse E

  • purpose: mining, quarrying, and oil and gas extraction
  • maximum rate per minute (litres): 74
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 48,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • period of taking: 10 years

Source name: Watercourse F

  • purpose: mining, quarrying, and oil and gas extraction
  • maximum rate per minute (litres): 74
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 48,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • period of taking: 10 years

Source name: Watercourse G

  • purpose: mining, quarrying, and oil and gas extraction
  • maximum rate per minute (litres): 74
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 48,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • period of taking: 10 years

Source name: Watercourse H

  • purpose: mining, quarrying, and oil and gas extraction
  • maximum rate per minute (litres): 74
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 48,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • period of taking: 10 years

Source name: Watercourse I

  • purpose: mining, quarrying, and oil and gas extraction
  • maximum rate per minute (litres): 74
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 48,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • period of taking: 10 years

Source name: Watercourse J

  • purpose: mining, quarrying, and oil and gas extraction
  • maximum rate per minute (litres): 74
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 48,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • period of taking: 10 years

Source name: Watercourse K

  • purpose: mining, quarrying, and oil and gas extraction
  • maximum rate per minute (litres): 74
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 48,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • period of taking: 10 years

Source name: Watercourse L

  • purpose: mining, quarrying, and oil and gas extraction
  • maximum rate per minute (mitres): 74
  • maximum number of hours of taking per day: 24
  • maximum volume per day (mitres): 48,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • period of taking: 10 years

Source name: Watercourse M

  • purpose: mining, quarrying, and oil and gas extraction
  • maximum rate per minute (litres): 74
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 48,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • period of taking: 10 years

Source name: Watercourse N

  • purpose: mining, quarrying, and oil and gas extraction
  • maximum rate per minute (litres): 74
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 48,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • period of taking: 10 years

Source name: Watercourse O

  • purpose: mining, quarrying, and oil and gas extraction
  • maximum rate per minute (litres): 74
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 48,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • period of taking: 10 years

Source name: Watercourse P

  • purpose: mining, quarrying, and oil and gas extraction
  • maximum rate per minute (litres): 74
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 48,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • period of taking: 10 years

Source name: Pancake Creek

  • purpose: mining, quarrying, and oil and gas extraction
  • maximum rate per minute (litres): 74
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 48,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • period of taking: 10 years

Source name: Malone Creek

  • purpose: mining, quarrying, and oil and gas extraction
  • maximum rate per minute (litres): 74
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 48,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • period of taking: 10 years

Information about Permits to Take Water

Issued Permits to Take Water can be viewed and downloaded at Access Ontario, by searching the approval number, P-300-1221871218, in the search field located at the top of the map, see “I want to…Search by Approval Number”, here:

https://www.lioapplications.lrc.gov.on.ca/Access_Environment/index.html?viewer=Access_Environment.AE&locale=en-CA.

Access Environment displays the following information:

  • business name
  • facility address and location on an interactive map
  • type of approval or registration from the ministry (view a PDF copy)
  • date of issue
  • status of the approval (approved, amended, revoked and/or replaced)
  • status of the registration (registered, suspended, removed)

Comments received

Through the registry

0

By email

2

By mail

0
View comments submitted through the registry

Effects of consultation

No specific concerns were raised. One Indigenous community responded to the ministry’s notification indicating that they have no concerns with this application at this time. A second Indigenous community responded indicating that they had a meeting setup with the proponent to discuss the application and have no further concerns at this time.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number

How to Appeal

This instrument decision can be appealed. You have 15 days from October 3, 2023 to begin the appeal process.

Carefully review the information below to learn more about the appeal process.

How to appealClick to Expand Accordion

Start the process to appeal

If you’re an Ontario resident, you can start the process to appeal this instrument decision.

First, you’ll need to seek leave (i.e. get permission) from the relevant appellate body to appeal the decision.

If the appellate body grants leave, the appeal itself will follow.

Seek leave to appeal

To seek leave to appeal, you need to do these three things:

  1. prepare your application
  2. provide notice to the minister
  3. mail your application to three parties

1. Prepare your application

You’ll need to prepare an application. You may wish to include the following things in your application:

  1. A document that includes:
    • your name, phone number, fax number (if any), and/or email address
    • the ERO number and ministry reference number (located on this page)
    • a statement about whether you are a resident in Ontario
    • your interest in the decision, and any facts you want taken into account in deciding whether you have an interest in the decision
    • the parts of the instrument that you’re challenging
    • whether the decision could result in significant harm to the environment
    • the reason(s) why you believe that no reasonable person – having regard to the relevant law and to any government policies developed to guide decisions of that kind – could have made the decision
    • the grounds (facts) you’ll be using to appeal
    • the outcome you’d like to see
  2. A copy of the instrument (approval, permit, order) that you you are seeking leave to appeal. You’ll find this in the decision notice on the Environmental Registry
  3. Copies of all supporting documents, facts and evidence that you’ll be using to appeal
What is considered

The appeal body will consider the following two questions in deciding whether to grant you leave to appeal:

  1. is there is good reason to believe that no reasonable person, with respect to the relevant law and to any government policies developed to guide decisions of that kind, could have made the decision?
  2. could the decision you wish to appeal result in significant harm to the environment?

2. Provide your notice

You’ll need to provide notice to the Minister of the Environment, Conservation and Parks that you’re seeking leave to appeal.

In your notice, please include a brief description of the:

  • decision that you wish to appeal
  • grounds for granting leave to appeal

You can provide notice by email at minister.mecp@ontario.ca or by mail at:

College Park 5th Floor, 777 Bay St.
Toronto, ON
M7A 2J3

3. Mail your application

You’ll need to mail your application that you prepared in step #1 to each of these three parties:

  • appellate body
  • issuing authority (the ministry official who issued the instrument)
  • proponent (the company or individual to whom the instrument was issued)

Issuing authority
Archana Uprety
Hydrogeologist Permit to Take Water (Acting)

Environmental Permissions Branch
135 St Clair Avenue West
Toronto, ON
M4V 1P5
Canada

(647) 248-9672

Proponent(s)

GATLING EXPLORATION INC.
800 West Pender Street
Unit 770
Vancouver, BC
V6C 2V6
Canada


Appellate body

Registrar, Ontario Land Tribunal
655 Bay Street, Suite 1500
Toronto, Ontario
M5G 1E5
(416) 212-6349
(866) 448-2248
OLT.Registrar@ontario.ca

About the Ontario Land Tribunal


Include the following:

ERO number
019-6958
Ministry reference number
1000221870

This is not legal advice. Please refer to the Environmental Bill of Rights for exact legal requirements. Consult a lawyer if you need help with the appeal process.

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice

Original proposal

ERO number
019-6958
Ministry reference number
1000221870
Notice type
Instrument
Act
Ontario Water Resources Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Proposal posted

Comment period

April 21, 2023 - May 21, 2023 (30 days)

Proposal details

This proposal is for a new Permit to Take Water for Gatling Exploration Inc. for mining, quarrying and gas extraction purposes. Water will be taken from eighteen 18 water courses and twelve 12 lakes. The water taking is as follows:

Permit type: New

Source name: Malone Lake

  • purpose: mining, quarrying, and oil and gas extraction
  • maximum rate per minute (litres): 133
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 192,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • period of taking: 10 years

Source name: Crosby Lake

  • purpose: mining, quarrying, and oil and gas extraction
  • maximum rate per minute (litres): 133
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 192,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • period of taking: 10 years

Source name: Monocle Lake

  • purpose: mining, quarrying, and oil and gas extraction
  • maximum rate per minute (litres): 133
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 192,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • period of taking: 10 years

Source name: Bear Lake

  • purpose: mining, quarrying, and oil and gas extraction
  • maximum rate per minute (litres): 133
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 192,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • period of taking: 10 years

Source name: Chief Tonene Lake

  • purpose: mining, quarrying, and oil and gas extraction
  • maximum rate per minute (litres): 133
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 192,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • period of taking: 10 years

Source name: Diamond Lake

  • purpose: mining, quarrying, and oil and gas extraction
  • maximum rate per minute (litres): 133
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 192,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • period of taking: 10 years

Source name: Marjorie Lake (lac Marjorie)

  • purpose: mining, quarrying, and oil and gas extraction
  • maximum rate per minute (litres): 133
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 192,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • period of taking: 10 years

Source name: Binney Lake

  • purpose: mining, quarrying, and oil and gas extraction
  • maximum rate per minute (litres): 133
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 192,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • period of taking: 10 years

Source name: Moosehead Lake

  • purpose: mining, quarrying, and oil and gas extraction
  • maximum rate per minute (Litres): 133
  • maximum number of hours of taking per day: 24
  • maximum volume per day (Litres): 192,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • period of taking: 10 years

Source name: Spectacle Lakes

  • purpose: mining, quarrying, and oil and gas extraction
  • maximum rate per minute (litres): 133
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 192,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • period of taking: 10 years

Source name: Killarney Lake (lac des Morts)

  • purpose: mining, quarrying, and oil and gas extraction
  • maximum rate per minute (litres): 133
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 192,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • period of taking: 10 years

Source name: Larder Lake

  • purpose: mining, quarrying, and oil and gas extraction
  • maximum rate per minute (litres): 133
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 192,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • period of taking: 10 years

Source name: Watercourse A

  • purpose: mining, quarrying, and oil and gas extraction
  • paximum rate per minute (litres): 74
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 48,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • period of taking: 10 years

Source name: Watercourse B

  • purpose: mining, quarrying, and oil and gas extraction
  • maximum rate per minute (litres): 74
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 48,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • period of taking: 10 years

Source name: Watercourse C

  • purpose: mining, quarrying, and oil and gas extraction
  • maximum rate per minute (litres): 74
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 48,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • period of taking: 10 years

Source name: Watercourse D

  • purpose: mining, quarrying, and oil and gas extraction
  • maximum rate per minute (litres): 74
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 48,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • period of taking: 10 years

Source name: Watercourse E

  • purpose: mining, quarrying, and oil and gas extraction
  • maximum rate per minute (litres): 74
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 48,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • period of taking: 10 years

Source name: Watercourse F

  • purpose: mining, quarrying, and oil and gas extraction
  • maximum rate per minute (litres): 74
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 48,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • period of taking: 10 years

Source name: Watercourse G

  • purpose: mining, quarrying, and oil and gas extraction
  • maximum rate per minute (litres): 74
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 48,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • period of taking: 10 years

Source name: Watercourse H

  • purpose: mining, quarrying, and oil and gas extraction
  • maximum rate per minute (litres): 74
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 48,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • period of taking: 10 years

Source name: Watercourse I

  • purpose: mining, quarrying, and oil and gas extraction
  • maximum rate per minute (litres): 74
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 48,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • period of taking: 10 years

Source name: Watercourse J

  • purpose: mining, quarrying, and oil and gas extraction
  • maximum rate per minute (litres): 74
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 48,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • period of taking: 10 years

Source name: Watercourse K

  • purpose: mining, quarrying, and oil and gas extraction
  • maximum rate per minute (litres): 74
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 48,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • period of taking: 10 years

Source name: Watercourse L

  • purpose: mining, quarrying, and oil and gas extraction
  • maximum rate per minute (mitres): 74
  • maximum number of hours of taking per day: 24
  • maximum volume per day (mitres): 48,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • period of taking: 10 years

Source name: Watercourse M

  • purpose: mining, quarrying, and oil and gas extraction
  • maximum rate per minute (litres): 74
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 48,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • period of taking: 10 years

Source name: Watercourse N

  • purpose: mining, quarrying, and oil and gas extraction
  • maximum rate per minute (litres): 74
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 48,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • period of taking: 10 years

Source name: Watercourse O

  • purpose: mining, quarrying, and oil and gas extraction
  • maximum rate per minute (litres): 74
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 48,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • period of taking: 10 years

Source name: Watercourse P

  • purpose: mining, quarrying, and oil and gas extraction
  • maximum rate per minute (litres): 74
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 48,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • period of taking: 10 years

Source name: Pancake Creek

  • purpose: mining, quarrying, and oil and gas extraction
  • maximum rate per minute (litres): 74
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 48,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • period of taking: 10 years

Source name: Malone Creek

  • purpose: mining, quarrying, and oil and gas extraction
  • maximum rate per minute (litres): 74
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 48,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • period of taking: 10 years

There are 3 categories of a Permit to Take Water:

  • Category 1: water takings are anticipated to have a lower risk of causing an unacceptable environmental impact/interference.
  • Category 2: water takings are anticipated to having a higher potential of causing unacceptable environmental impact or interference.
  • Category 3: water takings are anticipated to have the highest potential of causing unacceptable environmental impactor interference.

The proposed water taking qualifies as a Category 3 permit.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number

Comment

Commenting is now closed.

This consultation was open from April 21, 2023
to May 21, 2023

Connect with us

Contact