The Sarjeant Company Limited - Permit to take water

Instrument type: Permit to take water

ERO number
019-7447
Ministry reference number
7760-CTN247
Notice type
Instrument
Act
Ontario Water Resources Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal
Proposal posted
Comment period
August 3, 2023 - September 2, 2023 (30 days) Closed
Last updated

This consultation was open from:

August 3, 2023
to September 2, 2023

Proposal summary

This proposal is for a new Permit to Take Water for The Sarjeant Company Limited. Water will be taken from one pond for aggregate washing and dust control purposes, in Phelpston, Ontario.

Location details

Site address

1834 Flos Road Four West
Phelpston, ON
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

The Sarjeant Company Limited
15 Sarjeant Drive
Barrie, ON
L4N 4V9
Canada

Proposal details

This proposal is for a new Permit to Take Water for The Sarjeant Company Limited. Water will be taken from one pond for aggregate washing and dust control purpose, in Phelpston, Ontario. Details of the water taking are as follows:

Source of water - Aggregate Extraction Pond

  • purpose of taking: aggregate washing
  • maximum rate per minute (litres): 5,678
  • maximum number of hours of taking per day: 12
  • maximum volume per day (litres): 4,088,160
  • maximum number of days of taking per year: 180
  • period of water taking: between March 1 and December 31 for 10 years

Source of water - Aggregate Extraction Pond

  • purpose of taking: dust control
  • maximum rate per minute (litres): 909
  • maximum number of hours of taking per day: 5
  • maximum volume per day (litres): 272,700
  • maximum number of days of taking per year: 100
  • period of water taking: between March 1 and December 31 for 10 years

There are 3 categories of a Permit to Take Water:

  • Category 1: water takings are anticipated to have a lower risk of causing an unacceptable environmental impact/interference
  • Category 2: water takings are anticipated to having a higher potential of causing unacceptable environmental impact or interference
  • Category 3: water takings are anticipated to have the highest potential of causing unacceptable environmental impactor interference

The proposed water taking qualifies as a Category 3 permit.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number

Comment

Commenting is now closed.

The comment period was from August 3, 2023
to September 2, 2023

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice