Cargill Limited - Environmental Compliance Approval (air)

Instrument type: Environmental Compliance Approval (air)

ERO number
019-7477
Ministry reference number
4952-CSZHTY
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal
Proposal posted
Comment period
August 14, 2023 - September 28, 2023 (45 days) Closed
Last updated

This consultation was open from:

August 14, 2023
to September 28, 2023

Proposal summary

This proposal is for an amendment to the Limited Operational Flexibility for Environmental Compliance Approval No. 6376-BFQJYS for Cargill Limited, a facility that processes live poultry and produces frozen chicken meat products located in the City of London, Ontario.

Location details

Site address

10 Cuddy Boulevard
London, ON
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Cargill Limited
240 Graham Avenue
Winnipeg, MB
R3C 4C5
Canada

Proposal details

This proposal is for an amendment to the Limited Operational Flexibility for Environmental Compliance Approval (air & noise) No. 6376-BFQJYS for Cargill Limited, a facility that processes live poultry and produces frozen chicken meat products located in the City of London, Ontario.

The emission sources from the facility and the associated processes that discharge to the air include:

  • a processing boiler
  • oil burners
  • exhausts from boning room, prep room and blending lines

The amendment is for:

  • the increase of the production limit for the number of birds processed per day
  • an increase in kilograms of product prepared per hour

Emissions to the air from this facility include:

  • nitrogen oxides
  • particulate matter
  • vegetable oil
  • carbon dioxide
  • carbon monoxide
  • peracetic acid

The Environmental Compliance Approval with Limited Operational Flexibility (air), when issued, permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air).

The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment to renew these conditions.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number

Comment

Commenting is now closed.

The comment period was from August 14, 2023
to September 28, 2023

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice