This consultation was open from:
October 25, 2023
to November 24, 2023
Decision summary
The applicant has requested that this application be withdrawn and the file closed. The applicant no longer requires a Permit to Take Water.
Location details
Site address
2600 Stanley Avenue
Niagara Falls,
ON
Canada
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
Atura Hydrogen Inc., as general partner for and on behalf of Atura H2 L.P.
1415 Joshuas Creek Drive, Unit 101
Oakville,
ON
L6H 7L9
Canada
Decision details
The applicant has requested that this application be withdrawn and the file closed. The applicant no longer requires a Permit to Take Water.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
How to Appeal
Appeals are not allowed
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Original proposal
Proposal details
This proposal is for a new Permit to Take Water for Atura Hydrogen Inc., as general partner for and on behalf of Atura H2 L.P. Water will be taken from one watercourse for cooling water purposes serving a hydrogen production facility, located at 2600 Stanley Avenue in Niagara Falls, Ontario. Details of the water taking are as follows:
Source name: OPG Sir Adam Beck 2 Hydro Canal
- purpose of water taking: cooling water
- maximum rate per minute (litres): 15,000
- maximum number of hours of taking per day:24
- maximum volume per day (litres): 21,600,000
- maximum number of days of taking per year: 350
- period of taking: January 1 to December 31 for 10 years
There are 3 categories of a Permit to Take Water:
- Category 1: water takings are anticipated to have a lower risk of causing an unacceptable environmental impact/interference
- Category 2: water takings are anticipated to having a higher potential of causing unacceptable environmental impact or interference
- Category 3: water takings are anticipated to have the highest potential of causing unacceptable environmental impactor interference
The proposed water taking qualifies as a Category 2 permit.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Comment
Commenting is now closed.
This consultation was open from October 25, 2023
to November 24, 2023
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Comments received
Through the registry
0By email
0By mail
0