Jon North - Mineral exploration permit

Instrument type: Mineral exploration permit

ERO number
019-7820
Ministry reference number
PR-23-000292
Notice type
Instrument
Act
Mining Act, R.S.O. 1990
Posted by
Ministry of Mines
Notice stage
Proposal Updated
Proposal posted
Comment period
October 27, 2023 - November 26, 2023 (30 days) Closed
Last updated

Update Announcement

This proposal notice is being updated to advise the public that the permit application is still under review and the Ministry is considering concerns raised by an Aboriginal community which warrant additional time to adequately consider. The original proposal date and comment period have not been changed.

This consultation was open from:

October 27, 2023
to November 26, 2023

Proposal summary

The Ministry is proposing to issue a permit to Jon North (“the proponent”) to undertake early exploration activities.

Location details

Site location details

The early exploration activities are located approximately 115 kilometres Northwest of Nipigon, Ontario, in Havoc Lake and English Bay Areas, District of Thunder Bay, Northwest Region.

Claim numbers instructions: To view individual claims on a map please use the Mining Lands Administration System. Click on “I want to…” and select “Find a claim” to search by claim numbers or “Find a township” to search by township.

Claim numbers: 840519, 840520, 840521, 840522, 840523, 840524, 840525, 840526, 840527, 840528, 840529, 840530, 840531, 840532, 840533, 840534, 840535, 840536, 840537, 840538, 840539, 840540, 840541, 840542, 840543, 840544, 840545, 840546, 840547, 840548, 840549, 840550, 840551, 840552, 840553, 840554, 840555, 840556, 840557, 840558, 840559, 840560, 840561, 840562, 840563, 840564, 840565, 840566, 842832, 842833, 842834, 842835, 842836, 842837, 842838, 842839, 842840, 842841, 842842, 842843, 842844, 842845, 842846, 842847, 842848, 842849, 842850, 842851, 844409, 844410, 844411, 844412, 844413, 844414, 844415, 844416, 844417, 844418, 844419, 844420, 844421, 844422, 844423, 844424, 844425, 844426, 844427, 844428, 844429, 844430, 844431, 844432, 844433, 844434, 844435, 844436, 844437, 844438, 844439, 844440, 844441, 844442, 844443, 844444, 844445, 844446, 844447, 844448, 844449, 844450, 844451, 844452, 844453, 844454, 844455, 844456, 844457, 844458, 844459, 844460, 844461, 844462, 844463, 844464, 844465, 844466, 844467, 844472, 844473, 844474, 844475, 844476, 844477, 844478, 844479, 844480, 844481, 844482, 844483, 844484, 844485, 844486, 844487, 844488, 844489, 844490, 844491, 844492, 844493, 844494, 844495, 844496, 844497, 844498, 844499, 844500, 844501, 844502, 844503, 844504, 844505, 844506, 844507, 844508, 844509, 844510, 844511, 844512, 844513, 844514, 844515, 844516, 844517, 844518, 844519, 844520, 844521

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Jon North
402 Reynolds Street
Oakville, ON
L6J 3M4
Canada

Proposal details

The proponent has submitted an application to the ministry for an exploration permit as required under the Mining Act for prescribed early exploration activities.

The activities that this permit would allow the proponent to carry out are as follows:

Permit activities

  • mechanized stripping (greater than 100 square metres in a 200 metres radius)
  • pitting and trenching of bedrock (greater than 3 cubic metres in a 200-metre radius)

The potential disturbance from the activities are described as:

Mechanized Surface Stripping: uses heavy equipment to remove vegetation and soil (overburden) from bedrock. The potential environmental disturbance includes (but are not limited to): use of heavy equipment such as bulldozers, backhoes, excavators or forest harvest equipment, to remove soil from the bedrock, washing the bedrock by pumping water from nearby lakes, rivers or streams, and creation of access trails.

Pitting and Trenching: are conducted to gain a greater visual understanding of the rock. The potential environmental disturbance includes (but is not limited to): the removal of surface soil, exposed rock as well as excavation or blasting of rock leaving shallow holes or trenches that vary in depth and length from the use of heavy equipment.

Proponents are required to follow provincial standards for early exploration to minimize the impacts to public health, safety and the environment from early exploration activities described above. You can find the standards in the Activities Information Sheets or on the Ministry website under Mining Act Policies, Standards and Directives (see links in “Related links” section).

This notice is provided to receive comments that can be considered in the decision-making process prior to the issuance of an exploration permit.

An Exploration Permit does not relieve the proponent from compliance with any other requirements that are set out under the Mining Act or any other Act. All activities included in the Exploration Permit proposal must be carried out in compliance with Ontario Regulation 308/12 and the Provincial Standards for Early Exploration. The Exploration Permit duration will be up to 3 years with the possibility of renewal.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Mineral Development Office (Thunder Bay)
Address

435 James Street South
Suite B002
Thunder Bay, ON
P7E 6E3
Canada

Office phone number

Comment

Commenting is now closed.

The comment period was from October 27, 2023
to November 26, 2023