2780530 Ontario Inc. - Environmental Compliance Approval (sewage)

Instrument type: Environmental Compliance Approval (sewage)

ERO number
019-7888
Ministry reference number
5627-CW9HAV
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Decision
Decision posted
Comment period
November 15, 2023 - December 15, 2023 (30 days) Closed
Last updated

This consultation was open from:
November 15, 2023
to December 15, 2023

Decision summary

A new Environmental Compliance Approval was granted to 2780530 Ontario Inc., operating as Ridge Farms, for the stormwater management works serving Phase 1 greenhouse development with 14.43 hectares of catchment area, located at 2461 Albuna Townline (County Road 31), in the Town of Kingsville, County of Essex, Ontario.

Location details

Site address

2461 Albuna Townline (County Road 31)
Kingsville, ON
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

2780530 Ontario Inc.
363 Talbot Street West
Leamington, ON
N8H 4H3
Canada

Decision details

A new Environmental Compliance Approval was granted to 2780530 Ontario Inc., operating as Ridge Farms, for the stormwater management works serving Phase 1 greenhouse development with 14.43 hectares of catchment area, located at 2461 Albuna Townline (County Road 31), in the Town of Kingsville, County of Essex, Ontario.

The approved stormwater management works consist of:

  • roof water drainage pipe systems,
  • on-site storm sewers and swales,
  • one stormwater management wet pond having a permanent volume of approximately 3,465 cubic metres and an active storage volume of approximately 9,076 cubic metres for the 1:100 year storm event,
  • complete with emergency overflow spillway and a 250 diameter outlet pipe,
  • discharging into the King’s Highway 3 Branch of the Sturgeon Creek Drain with a maximum release rate of 43 litres per second for the 1:100 year storm event

Comments received

Through the registry

0

By email

0

By mail

0
View comments submitted through the registry

Effects of consultation

No comments were received.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Windsor District Office
Address

4510 Rhodes Dr
Windsor, ON
N8W 5K5
Canada

Office phone number

How to Appeal

This instrument decision can be appealed. You have 15 days from September 13, 2024 to begin the appeal process.

Carefully review the information below to learn more about the appeal process.

How to appealClick to Expand Accordion

Start the process to appeal

If you’re an Ontario resident, you can start the process to appeal this instrument decision.

First, you’ll need to seek leave (i.e. get permission) from the relevant appellate body to appeal the decision.

If the appellate body grants leave, the appeal itself will follow.

Seek leave to appeal

To seek leave to appeal, you need to do these three things:

  1. prepare your application
  2. provide notice to the minister
  3. mail your application to three parties

1. Prepare your application

You’ll need to prepare an application. You may wish to include the following things in your application:

  1. A document that includes:
    • your name, phone number, fax number (if any), and/or email address
    • the ERO number and ministry reference number (located on this page)
    • a statement about whether you are a resident in Ontario
    • your interest in the decision, and any facts you want taken into account in deciding whether you have an interest in the decision
    • the parts of the instrument that you’re challenging
    • whether the decision could result in significant harm to the environment
    • the reason(s) why you believe that no reasonable person – having regard to the relevant law and to any government policies developed to guide decisions of that kind – could have made the decision
    • the grounds (facts) you’ll be using to appeal
    • the outcome you’d like to see
  2. A copy of the instrument (approval, permit, order) that you you are seeking leave to appeal. You’ll find this in the decision notice on the Environmental Registry
  3. Copies of all supporting documents, facts and evidence that you’ll be using to appeal
What is considered

The appeal body will consider the following two questions in deciding whether to grant you leave to appeal:

  1. is there is good reason to believe that no reasonable person, with respect to the relevant law and to any government policies developed to guide decisions of that kind, could have made the decision?
  2. could the decision you wish to appeal result in significant harm to the environment?

2. Provide your notice

You’ll need to provide notice to the Minister of the Environment, Conservation and Parks that you’re seeking leave to appeal.

In your notice, please include a brief description of the:

  • decision that you wish to appeal
  • grounds for granting leave to appeal

You can provide notice by email at minister.mecp@ontario.ca or by mail at:

College Park 5th Floor, 777 Bay St.
Toronto, ON
M7A 2J3

3. Mail your application

You’ll need to mail your application that you prepared in step #1 to each of these three parties:

  • appellate body
  • issuing authority (the ministry official who issued the instrument)
  • proponent (the company or individual to whom the instrument was issued)

Issuing authority
Sherif Hegazy M Sc. P. Eng
Manager

Environmental Permission Branch
135 St Clair Avenue West
7th Floor
Toronto, ON
M4V 1P5
Canada

416 562 7910

Proponent(s)

2780530 Ontario Inc.
363 Talbot Street West
Leamington, ON
N8H 4H3
Canada


Appellate body

Registrar, Ontario Land Tribunal
655 Bay Street, Suite 1500
Toronto, Ontario
M5G 1E5
(416) 212-6349
(866) 448-2248
OLT.Registrar@ontario.ca

About the Ontario Land Tribunal


Include the following:

ERO number
019-7888
Ministry reference number
5627-CW9HAV

This is not legal advice. Please refer to the Environmental Bill of Rights for exact legal requirements. Consult a lawyer if you need help with the appeal process.

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice

Original proposal

ERO number
019-7888
Ministry reference number
5627-CW9HAV
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Proposal posted

Comment period

November 15, 2023 - December 15, 2023 (30 days)

Proposal details

This proposal is for an Environmental Compliance Approval serving 2780530 Ontario Inc. for the stormwater management works serving the Ridge Farms greenhouse site, including new stormwater management facilities including a S.W.M. detention pond, to accommodate the proposed Phase 1 greenhouse development for collection, transmission, treatment and disposal of stormwater run-off from the lands located at 2461 Albuna Townline (County Road 31) in the Town of Kingsville, County of Essex, Ontario.

The stormwater management facilities consist of the following:

  • roof water drainage pipe systems, swales and on-site storm sewers, discharging roof top runoff and other surface runoff to the stormwater detention pond
  • one stormwater management wet pond having an active storage volume of 9,076 cubic meters with a maximum water depth of 2.473 meters for the 1:100 year storm event, discharging with a maximum release rate of 87 liters per second into the King’s Highway Branch of the Sturgeon Creek Drain
  • one stormwater outlet structure from which a 250 diameter outlet pipe will discharge flows into the King’s Highway Branch of the Sturgeon Creek Drain
  • one emergency overflow spillway directed to the King’s Highway Branch of the Sturgeon Creek Drain for storm events in excess of the 1:100 year

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada

Office phone number

Comment

Commenting is now closed.

This consultation was open from November 15, 2023
to December 15, 2023

Connect with us

Contact