This consultation was open from:
December 8, 2023
to January 22, 2024
Decision summary
An approval was issued to amend Environmental Compliance Approval (air & noise) No. 1057-8V9NMY for the renewal of the Operational Flexibility conditions for Opta Inc., a facility manufacturing synthetic slag, located at 871 Arvin Avenue in the City of Hamilton, Ontario.
Location details
Site address
871 Arvin Avenue
Hamilton,
ON
Canada
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
Opta Inc.
871 Arvin Avenue
Hamilton,
ON
L8E 5N8
Canada
Decision details
An approval was issued to amend Environmental Compliance Approval (air & noise) No. 1057-8V9NMY for the renewal of the Operational Flexibility conditions for Opta Inc., a facility manufacturing synthetic slag, located at 871 Arvin Avenue in the City of Hamilton, Ontario.
The emission sources from the manufacturing and associated processes that discharge to the air include:
- raw material unloading and storage
- product loading and bagging operations
- supporting equipment and processes
The facility production limit of 912,000 kilograms per day of synthetic slag products remains unchanged.
Emissions to the air from this facility include:
- suspended particulate matter
- aluminum oxide
- calcium oxide
- iron oxide
- magnesium oxide
- vanadium oxide
- calcium carbonate
- wollastonite
- crystalline silica
- petroleum coke
- calcium fluoride
- calcium aluminate
- blast furnace slag
- products of combustion such as nitrogen oxides
The approval is an Environmental Compliance Approval (air) with Operational Flexibility, which is a single approval that replaces all the current Environmental Compliance Approvals for air at this facility, and includes the addition of new, or historically unapproved, sources for all emissions from the facility.
The Environmental Compliance Approval (air) with Operational Flexibility requires that the company demonstrates compliance on an ongoing basis with:
- Ontario Regulation 419/05
- applicable ministry guidelines for air and noise
- other performance requirements as specified in their conditions
It permits modifications such as process changes, de-bottlenecking or addition of new equipment subject to limits on operational flexibility that include a production limit for the facility specified in the approval.
The operational flexibility conditions have a 10 years expiry date. The company is required to make an application for amendment at that time to renew these conditions. Of specific public interest, one condition that is included in the approval requires the company to make available, at all times, at the facility for inspection by interested members of the public a table (emission summary table) that documents the facility’s compliance with Ontario Regulation 419/05.
Effects of consultation
No comments were received.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
How to Appeal
This instrument decision can be appealed. You have 15 days from August 28, 2024 to begin the appeal process.
Carefully review the information below to learn more about the appeal process.
How to appealClick to Expand Accordion
Start the process to appeal
If you’re an Ontario resident, you can start the process to appeal this instrument decision.
First, you’ll need to seek leave (i.e. get permission) from the relevant appellate body to appeal the decision.
If the appellate body grants leave, the appeal itself will follow.
Seek leave to appeal
To seek leave to appeal, you need to do these three things:
- prepare your application
- provide notice to the minister
- mail your application to three parties
1. Prepare your application
You’ll need to prepare an application. You may wish to include the following things in your application:
- A document that includes:
- your name, phone number, fax number (if any), and/or email address
- the ERO number and ministry reference number (located on this page)
- a statement about whether you are a resident in Ontario
- your interest in the decision, and any facts you want taken into account in deciding whether you have an interest in the decision
- the parts of the instrument that you’re challenging
- whether the decision could result in significant harm to the environment
- the reason(s) why you believe that no reasonable person – having regard to the relevant law and to any government policies developed to guide decisions of that kind – could have made the decision
- the grounds (facts) you’ll be using to appeal
- the outcome you’d like to see
- A copy of the instrument (approval, permit, order) that you you are seeking leave to appeal. You’ll find this in the decision notice on the Environmental Registry
- Copies of all supporting documents, facts and evidence that you’ll be using to appeal
What is considered
The appeal body will consider the following two questions in deciding whether to grant you leave to appeal:
- is there is good reason to believe that no reasonable person, with respect to the relevant law and to any government policies developed to guide decisions of that kind, could have made the decision?
- could the decision you wish to appeal result in significant harm to the environment?
2. Provide your notice
You’ll need to provide notice to the Minister of the Environment, Conservation and Parks that you’re seeking leave to appeal.
In your notice, please include a brief description of the:
- decision that you wish to appeal
- grounds for granting leave to appeal
You can provide notice by email at minister.mecp@ontario.ca or by mail at:
College Park 5th Floor, 777 Bay St.
Toronto, ON
M7A 2J3
3. Mail your application
You’ll need to mail your application that you prepared in step #1 to each of these three parties:
- appellate body
- issuing authority (the ministry official who issued the instrument)
- proponent (the company or individual to whom the instrument was issued)
Opta Inc.
871 Arvin Avenue
Hamilton,
ON
L8E 5N8
Canada
Registrar, Ontario Land Tribunal
655 Bay Street, Suite 1500
Toronto, Ontario
M5G 1E5
(416) 212-6349
(866) 448-2248
OLT.Registrar@ontario.ca
Include the following:
This is not legal advice. Please refer to the Environmental Bill of Rights for exact legal requirements. Consult a lawyer if you need help with the appeal process.
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Original proposal
Proposal details
This proposal is for the renewal of the Limited Operational Flexibility for Environmental Compliance Approval (air & noise) No.1057-8V9NMY for Opta Inc., a facility manufacturing synthetic slag located at 871 Arvin Avenue in the City of Hamilton, Ontario.
The emission sources from the manufacturing and associated processes that discharge to the air include dust collectors for the raw material offloading and storage silos, product loading, and bagging operations, as well as all supporting equipment and processes at the site. The facility production limit is 912,000 kilograms per day of synthetic slag products.
Emissions to the air from this facility include:
- aluminum oxide
- calcium oxide
- iron oxide
- magnesium oxide
- vanadium oxide
- calcium carbonate
- wollastonite
- crystalline silica
- petroleum coke
- amorphous silica
- calcium fluoride
- calcium aluminate
- particulate matter
The Environmental Compliance Approval with Limited Operational Flexibility (air), when issued, permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air). The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Comment
Commenting is now closed.
This consultation was open from December 8, 2023
to January 22, 2024
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Comments received
Through the registry
0By email
0By mail
0