The Quaternary Mining & Exploration Company Limited - Mineral exploration permit

Instrument type: Mineral exploration permit

ERO number
019-8242
Ministry reference number
PR-23-000263
Notice type
Instrument
Act
Mining Act, R.S.O. 1990
Posted by
Ministry of Mines
Notice stage
Proposal Updated
Proposal posted
Comment period
February 8, 2024 - March 9, 2024 (30 days) Closed
Last updated

Update Announcement

The proposal notice is being updated on March 22, 2024 to advise the public that the permit application is still under review and the Ministry is considering concerns raised by an Aboriginal community which warrant additional time to adequately consider. The original proposal date and comment period have not been altered.

This consultation was open from:

February 8, 2024
to March 9, 2024

Proposal summary

The Ministry is proposing to issue a permit to The Quaternary Mining & Exploration Company Limited (“the proponent”) to undertake early exploration activities.

Location details

Site location details

The mining activities are located approximately 3 kilometres southeast of Geraldton, Ontario, in Ashmore township, District of Thunder Bay, Thunder Bay North Region.

To view individual claims on a map please use the Mining Lands Administration System. Click on “I want to…” and select “Find a claim” to search by claim numbers or “Find a township” to search by township.

Claim numbers: 106504, 106505, 112493, 124537, 124538, 132196, 145814, 148164, 159390, 164710, 165915, 174402, 188020, 203904, 223984, 223985, 232014, 232015, 237927, 247932, 247933, 248604, 257158, 257252, 277809, 277810, 280025, 283821, 299216, 299217, 300771, 312623, 314617, 327402, 327829, 331912, 336547, 338987, 343454, 521867, 521868, 521869, 521870, 563885, 563886

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

The Quaternary Mining & Exploration Company Limited
Suite 1401 40 Richview Rd
Etobicoke, ON
M9A 5C1
Canada

Proposal details

The proponent has submitted an application to the ministry for an exploration permit as required under the Mining Act for prescribed early exploration activities.

The activities that this permit would allow the proponent to carry out are as follows (only keep those activities that apply to the application):

  • line cutting (greater than 1.5 metres in width)
  • mechanized surface stripping (greater than 100 square metres in a 200 metres radius)
  • pitting and trenching of bedrock (greater than 3 cubic metres in a 200-metre radius)
  • mechanized drilling (where the drill weight is greater than 150 kilograms)

Plan activities

  • geophysical survey requiring generator type

The potential disturbance from the activities are described as (only keep those activities that apply to the application):

Line Cutting (greater than 1.5 metres in width): is done to prepare an area of mineral potential for further geological or geophysical activities. The potential environmental disturbance includes (but are not limited to): cutting trees and vegetation greater than 1.5 metre corridor with an axe, machete or chainsaw, clearing underbrush, and driving wood pickets into the ground.

Mechanized Surface Stripping: uses heavy equipment to remove vegetation and soil (overburden) from bedrock. The potential environmental disturbance includes (but are not limited to): use of heavy equipment such as bulldozers, backhoes, excavators or forest harvest equipment, to remove soil from the bedrock, washing the bedrock by pumping water from nearby lakes, rivers or streams, and creation of access trails.

Pitting and Trenching: are conducted to gain a greater visual understanding of the rock. The potential environmental disturbance includes (but is not limited to): the removal of surface soil, exposed rock as well as excavation or blasting of rock leaving shallow holes or trenches that vary in depth and length from the use of heavy equipment.

Mechanized Drilling: provides rock samples from below the surface. Testing the samples determines the properties of the soil and rocks, including mineral and metal content. Potential environmental disturbances include (but are not limited to): clearing surface terrain for “drill pads” (small areas cleared for drill rigs and/or helicopters), installing casings (hollow steel pipes called the collar), and pumping water from a sump, nearby lakes, rivers or streams.

Geophysical Survey Requiring Generator Type: the activity consists of line-cutting, using hand tools only. Potential disturbances include clearing out underbrush to establish a grid in order to temporarily lay wire lines used to record geophysical measurements. In light underbrush there is likely little or no brushing. This is a one-time exercise and unless the underbrush is continually cleared, it will typically regenerate within the same or next growing season.

Proponents are required to follow provincial standards for early exploration to minimize the impacts to public health, safety and the environment from early exploration activities described above. You can find the standards in the Activities Information Sheets or on the Ministry website under Mining Act Policies, Standards and Directives (see links in “Related links” section).

This notice is provided to receive comments that can be considered in the decision-making process prior to the issuance of an exploration permit.

An Exploration Permit does not relieve the proponent from compliance with any other requirements that are set out under the Mining Act or any other Act. All activities included in the Exploration Permit proposal must be carried out in compliance with Ontario Regulation 308/12 and the Provincial Standards for Early Exploration. The Exploration Permit duration will be up to 3 years with the possibility of renewal.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Mineral Development Office (Thunder Bay)
Address

435 James Street South
Suite B002
Thunder Bay, ON
P7E 6E3
Canada

Office phone number

Comment

Commenting is now closed.

The comment period was from February 8, 2024
to March 9, 2024

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice