This consultation was open from:
February 9, 2024
to March 25, 2024
Proposal summary
Renewal and amendment to the Limited Operational Flexibility for Environmental Compliance Approval (air & noise) No. 9909-9DGPA5 for Owens Corning Insulating Systems Canada GP Inc. for and on behalf of Owens Corning Insulating Systems Canada LP, a facility that glass fiber insulation products, located in the City of Toronto, Ontario.
Location details
Site address
3450 McNicoll Avenue
Toronto,
ON
M1V 1Z5
Canada
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
Owens Corning Insulating Systems Canada GP Inc. for and on behalf of Owens Corning Insulating Systems Canada LP
3450 McNicoll Avenue
Toronto,
ON
M1V 1Z5
Canada
Proposal details
This proposal is for renewal and amendment to the Limited Operational Flexibility for Environmental Compliance Approval (air & noise) No. 9909-9DGPA5 for Owens Corning Insulating Systems Canada GP Inc. for and on behalf of Owens Corning Insulating Systems Canada LP, a facility that glass fiber insulation products, located in the City of Toronto, Ontario.
The emission sources from the manufacturing and associated processes that discharge to the air include:
- dust collectors
- ovens
- boilers
- tanks
- cooling towers
- paint spray booth
The amendment includes change in process to TO2 furnace; change to process in the TO-1 forming line and change to batch material. Emissions to the air from this facility include:
- silica-respirable
- quartz
- manganese compounds
- particulate matter
- formaldehyde
- nitrogen oxides
- nickel, and
- chromium compounds
The Environmental Compliance Approval with Limited Operational Flexibility (air), when issued, permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air). The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Comment
Commenting is now closed.
The comment period was from February 9, 2024
to March 25, 2024