Cette consultation a eu lieu :
du 9 février 2024
au 25 mars 2024
Résumé de la proposition
Renewal and amendment to the Limited Operational Flexibility for Environmental Compliance Approval (air & noise) No. 9909-9DGPA5 for Owens Corning Insulating Systems Canada GP Inc. for and on behalf of Owens Corning Insulating Systems Canada LP, a facility that glass fiber insulation products, located in the City of Toronto, Ontario.
Détails de l'emplacement
Adresse du site
3450 McNicoll Avenue
Toronto,
ON
M1V 1Z5
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Owens Corning Insulating Systems Canada GP Inc. for and on behalf of Owens Corning Insulating Systems Canada LP
3450 McNicoll Avenue
Toronto,
ON
M1V 1Z5
Canada
Détails de la proposition
This proposal is for renewal and amendment to the Limited Operational Flexibility for Environmental Compliance Approval (air & noise) No. 9909-9DGPA5 for Owens Corning Insulating Systems Canada GP Inc. for and on behalf of Owens Corning Insulating Systems Canada LP, a facility that glass fiber insulation products, located in the City of Toronto, Ontario.
The emission sources from the manufacturing and associated processes that discharge to the air include:
- dust collectors
- ovens
- boilers
- tanks
- cooling towers
- paint spray booth
The amendment includes change in process to TO2 furnace; change to process in the TO-1 forming line and change to batch material. Emissions to the air from this facility include:
- silica-respirable
- quartz
- manganese compounds
- particulate matter
- formaldehyde
- nitrogen oxides
- nickel, and
- chromium compounds
The Environmental Compliance Approval with Limited Operational Flexibility (air), when issued, permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air). The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 9 février 2024
au 25 mars 2024