Napanee BESS Inc. - Environmental Compliance Approval (sewage)

Instrument type: Environmental Compliance Approval (sewage)

ERO number
019-8382
Ministry reference number
6204-D2UJB5
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal
Proposal posted
Comment period
March 11, 2024 - April 25, 2024 (45 days) Closed
Last updated

This consultation was open from:

March 11, 2024
to April 25, 2024

Proposal summary

This proposal is for a new Environmental Compliance Approval for stormwater management works serving Napanee BESS Inc., located in the Town of Greater Napanee, Ontario.

Location details

Site address

Lot 21 & Concession 1
Geographic Township of Fredericksburgh
Town of Greater Napanee, District of Lennox and Addington, ON
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Napanee BESS Inc.
1415 Joshua Creek Drive, Suite 200
Oakville, ON
L6H 7G4
Canada

Proposal details

This proposal is for a new Environmental Compliance Approval for stormwater management works serving Napanee BESS Inc., located in the Town of Greater Napanee, Ontario.

The stormwater management works comprise of stormwater quality control, quantity control, and erosion control works, and include on-site ditches, culverts, manholes, storm sewers, oil/water separator, and a wet pond, and will discharge to an existing ditch along Loyalist Parkway (highway 33) and ultimately, Lake Ontario.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number

Comment

Commenting is now closed.

The comment period was from March 11, 2024
to April 25, 2024

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice