This consultation was open from:
March 19, 2024
to May 20, 2024
Proposal summary
R.W. Tomlinson Ltd. has applied for a licence to operate a quarry below the water table in the City of Ottawa.
Location details
Site location details
City of Ottawa, Ottawa-Carleton Region.
Part Lots 14-16, Concession 11, Geographic Township of Goulbourn.
This site is located at 635 and 891 Jinkinson Road.
This site has coordinates at Latitude 45.24089° N Longitude 75.97723° W.
The site is adjacent to the east boundary of Aggregate Resources Act (ARA) Licence No. 39958.
A link to our mapping tool allows you to locate and view licensed sites under the ARA.
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
R.W Tomlinson Ltd.
100 Citigate Drive
Ottawa,
ON
K2J 6K7
Canada
Proposal details
R.W. Tomlinson Ltd. has applied for a Class A licence, Quarry, Below Water, to excavate aggregate from a quarry of 121.7 hectares in size with an extraction area of 108.7 hectares.
This application is for an expansion to the existing ARA Licence No. 39958. It is proposed that all tonnage removed from the proposed licence and adjacent ARA Licence No. 39958 will be combined for total annual tonnage of 3,000,000 tonnes.
Other information
R.W. Tomlinson Ltd. currently operates the adjacent site under the authority of Licence No. 39958 under the ARA. In total 53.8 hectares are currently licenced as quarry. The annual tonnage condition is unlimited tonnes.
The extraction of aggregate from a pit or quarry on private land designated by regulation, in the Province of Ontario, requires the issuance of a licence. Ontario Regulation 244/97 and the Aggregate Resources of Ontario Standards set out the application process and requirements.
For each new licence, the applicant must provide information (site plan, summary statement, technical reports) with respect to the existing features, operation and rehabilitation of the site to demonstrate that the proposed operation will minimize adverse impact on the environment.
For this proposal, the following information has been prepared and submitted to the Ministry of Natural Resources and Forestry (MNRF):
- Site plan
- Summary Statement
- Natural Environment Report
- Cultural Heritage Report (Stage 1 Archaeological Assessment)
- Maximum Predicted Water Table Report
- Water Report (Level 1 and Level 2 Water Report)
- Noise Assessment Report (Acoustic Assessment Report)
- Blast Design Report (Blast Impact Analysis)
The Site Plan addresses existing features of the pit and/or quarry area (existing natural features and land use on and surrounding the site within 120 meters); the proposed operation (shape, dimensions, area and depth to be excavated, method of extraction); and progressive and final rehabilitation.
The Summary Statement includes information on one or more of the following considerations: land use planning, agricultural classification, quality and quantity of aggregate, haul routes, truck traffic and entrance permits, progressive and final rehabilitation, surface water, and elevation of the established groundwater table.
The Natural Environment Report identifies the presence of significant natural heritage features/areas that exist on the site or within 120 meters of the site. Where any of the features or areas have been identified, the report must identify and evaluate any negative impacts on the features or areas and ecological functions, and identify any proposed preventative, mitigative or remedial measures. The report must also identify if the application site or any of the features are located within a natural heritage system that has been identified by a municipality in ecoregions 6E and 7E or by the province as part of a provincial plan.
The Cultural Heritage Report must be consistent with provincial requirements under the Ontario Heritage Act and the Provincial Policy Statement. Screening checklists evaluating the potential for archaeological resources, built heritage and cultural heritage landscapes, with supporting documentation, is required. Where screening indicates that assessments are requirement to be completed, the assessment reports and letters from the Ministry of Tourism, Culture and Sport must be obtained.
A report must be prepared that details how the maximum predicted water table is identified in metres above sea level, relative to the proposed depth of excavation at the site.
Applications proposing to excavate below the maximum predicted water table must complete a Water Report. Level 1 determines the potential for impacts to ground water and surface water resources and their uses. If the Level 1 identifies a potential for impacts resulting from the operation, then an impact assessment (Level 2) is required to determine the significance of the effect and potential for mitigation.
A Noise Assessment report is prepared if proposed excavation and/or processing facilities are within 150 meters (for pit applications) or 500 meters (for quarry applications) of a sensitive receptor. The report is required to determine whether provincial guidelines for Stationary and Transportation Sources can be satisfied.
A Blast Design report is prepared if a sensitive receptor is within 500 metres of the limit of excavation for a Class A quarry application. The report is required to demonstrate that provincial guidelines for blast overpressure and ground vibration can be satisfied.
The Ministry reviews all comments received through the Environmental Registry and the notification and consultation process under the Aggregate Resources Act (ARA), and considers them before making a decision. Comments received through the Environmental Registry are considered by the Ministry however, the process under the ARA is proponent driven. This means that comments for consideration by the applicant under the ARA process must be submitted to the applicant and the Ministry during the 60-day consultation period initiated by the applicant.
Details of the application process can be found in Ontario Regulation 244/97 under the ARA and on the Ministry website at aggregate resources|ontario.ca. Many regulatory changes for new applications took effect on April 1, 2021. This means that applications submitted after March 31, 2021 must meet the new requirements in Ontario Regulation 244/97 and Aggregate Resources of Ontario Standards.
Public consultation opportunities
Written notice concerning this application was delivered to landowners within 120 meters of the proposed licensed boundary; an information sign, giving notice to the public of this application, was erected at the proposed site; and a Public Notice of Application appeared in the local paper, the Ottawa Citizen on March 29, 2024.
The information submitted in support of this application can be viewed at https://tomlinsongroup.com/stittsville-quarry-2-technical-documents/ or by contacting cbellinger@tomlinsongroup.com. A Public Information Session to present the details of the proposed new licence will be held on April 18, 2024 from 6:00 to 8:00 p.m. at the Johnny Leroux (Stittsville) Arena, 10 Warner-Colpitts Lane, Ottawa. To participate in this session, please contact Neal DeRuyter, MHBC Planning at nderuyter@mhbcplan.com or 519-576-3650 for an invitation.
The application for this licence is being circulated within the Ministry of Natural Resources and Forestry. Additionally, notification of this application has been forwarded to the City of Ottawa, Ottawa-Carleton Region, Rideau Valley Conservation Authority, Ministry of Transportation and the Ministry of the Environment, Conservation and Parks, for comment.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
300 Water Street, 4th Floor, South tower
Peterborough,
ON
K9J 3C7
Canada
Connect with us
Contact
Meghan Gerrie
1 Stone Road West
Guelph,
ON
N1G 4Y2
Canada
Comment
Commenting is now closed.
The comment period was from March 19, 2024
to May 20, 2024