Ontario Power Generation Inc. - Environmental Compliance Approval (sewage)

Instrument type: Environmental Compliance Approval (sewage)

ERO number
019-8526
Ministry reference number
7866-D46NVR
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Decision
Decision posted
Comment period
April 12, 2024 - May 27, 2024 (45 days) Closed
Last updated

This consultation was open from:
April 12, 2024
to May 27, 2024

Decision summary

The ministry has issued a new Environmental Compliance Approval for industrial stormwater management works to Ontario Power Generation Inc., located at 1 Holt Road South in Bowmanville, Ontario.

Location details

Site address

1 Holt Road South
Bowmanville, ON
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Ontario Power Generation Inc.
1 Holt Road South
Bowmanville, ON
L1C 3Z8
Canada

Decision details

The ministry has issued a new Environmental Compliance Approval for industrial stormwater management works to Ontario Power Generation Inc., located at 1 Holt Road South in Bowmanville, Ontario.

The stormwater management works are associated with the proposed development of a permanent storage area for surplus soil from site excavation and construction activities from the Darlington New Nuclear Project.

The stormwater management works comprises of stormwater quality control, quantity control, and erosion control works, and include perimeter ditches and enhanced swales around the spoils pile, and an end-of-pipe dry pond and storage swale, with discharge to Darlington Creek.

The ministry has imposed effluent monitoring requirements.

Comments received

Through the registry

0

By email

0

By mail

0
View comments submitted through the registry

Effects of consultation

No comments were received.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number

How to Appeal

This instrument decision can be appealed. You have 15 days from October 28, 2024 to begin the appeal process.

Carefully review the information below to learn more about the appeal process.

How to appealClick to Expand Accordion

Start the process to appeal

If you’re an Ontario resident, you can start the process to appeal this instrument decision.

First, you’ll need to seek leave (i.e. get permission) from the relevant appellate body to appeal the decision.

If the appellate body grants leave, the appeal itself will follow.

Seek leave to appeal

To seek leave to appeal, you need to do these three things:

  1. prepare your application
  2. provide notice to the minister
  3. mail your application to three parties

1. Prepare your application

You’ll need to prepare an application. You may wish to include the following things in your application:

  1. A document that includes:
    • your name, phone number, fax number (if any), and/or email address
    • the ERO number and ministry reference number (located on this page)
    • a statement about whether you are a resident in Ontario
    • your interest in the decision, and any facts you want taken into account in deciding whether you have an interest in the decision
    • the parts of the instrument that you’re challenging
    • whether the decision could result in significant harm to the environment
    • the reason(s) why you believe that no reasonable person – having regard to the relevant law and to any government policies developed to guide decisions of that kind – could have made the decision
    • the grounds (facts) you’ll be using to appeal
    • the outcome you’d like to see
  2. A copy of the instrument (approval, permit, order) that you you are seeking leave to appeal. You’ll find this in the decision notice on the Environmental Registry
  3. Copies of all supporting documents, facts and evidence that you’ll be using to appeal
What is considered

The appeal body will consider the following two questions in deciding whether to grant you leave to appeal:

  1. is there is good reason to believe that no reasonable person, with respect to the relevant law and to any government policies developed to guide decisions of that kind, could have made the decision?
  2. could the decision you wish to appeal result in significant harm to the environment?

2. Provide your notice

You’ll need to provide notice to the Minister of the Environment, Conservation and Parks that you’re seeking leave to appeal.

In your notice, please include a brief description of the:

  • decision that you wish to appeal
  • grounds for granting leave to appeal

You can provide notice by email at minister.mecp@ontario.ca or by mail at:

College Park 5th Floor, 777 Bay St.
Toronto, ON
M7A 2J3

3. Mail your application

You’ll need to mail your application that you prepared in step #1 to each of these three parties:

  • appellate body
  • issuing authority (the ministry official who issued the instrument)
  • proponent (the company or individual to whom the instrument was issued)

Issuing authority
Sherif Hegazy M Sc. P. Eng
Manager

Environmental Permission Branch
135 St Clair Avenue West
7th Floor
Toronto, ON
M4V 1P5
Canada

416 562 7910

Proponent(s)

Ontario Power Generation Inc.
1 Holt Road South
Bowmanville, ON
L1C 3Z8
Canada


Appellate body

Registrar, Ontario Land Tribunal
655 Bay Street, Suite 1500
Toronto, Ontario
M5G 1E5
(416) 212-6349
(866) 448-2248
OLT.Registrar@ontario.ca

About the Ontario Land Tribunal


Include the following:

ERO number
019-8526
Ministry reference number
7866-D46NVR

This is not legal advice. Please refer to the Environmental Bill of Rights for exact legal requirements. Consult a lawyer if you need help with the appeal process.

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice

Original proposal

ERO number
019-8526
Ministry reference number
7866-D46NVR
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Proposal posted

Comment period

April 12, 2024 - May 27, 2024 (45 days)

Proposal details

The proposal is for a new Environmental Compliance Approval for industrial stormwater management works serving Ontario Power Generation Inc., located at 1 Holt Road South in Bowmanville, Ontario.

The stormwater management works are associated with the proposed development of a permanent storage area for surplus soil from site excavation and construction activities from the Darlington New Nuclear Project.

The stormwater management works comprises of stormwater quality control, quantity control, and erosion control works, and include perimeter ditches and enhanced swales around the spoils pile, and an end-of-pipe dry pond, with discharge to Darlington Creek.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number

Comment

Commenting is now closed.

This consultation was open from April 12, 2024
to May 27, 2024

Connect with us

Contact