Parry Sound Ready Mix Limited - Environmental Compliance Approval (air)

Instrument type: Environmental Compliance Approval (air)

ERO number
019-8918
Ministry reference number
5511-D5BLPR
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal
Proposal posted
Comment period
July 11, 2024 - August 25, 2024 (45 days) Closed
Last updated

This consultation was open from:

July 11, 2024
to August 25, 2024

Proposal summary

This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (Air & Noise) for Parry Sound Ready Mix Limited, a concrete manufacturing facility, located in the Town of Parry Sound, Ontario.

Location details

Site address

180 Oastler Park Drive
Parry Sound, Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Parry Sound Ready Mix Limited
180 Oastler Park Drive
Parry Sound, ON
P2A 2W8
Canada

Proposal details

This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (Air & Noise) which replaces all the current Environmental Compliance Approvals for Air at this facility and includes the addition of new or historically unapproved sources for all emissions from Parry Sound Ready Mix Limited, a concrete manufacturing facility, located in the Town of Parry Sound, Ontario. The application includes all sources at the facility, including receiving and stockpiling aggregates, transportation of cementious materials to silos and hoppers, receiving and storage of chemical additives, a truck washout operation, and an oil-fueled boiler. Emissions to the air from this facility include:

  • nitrogen oxides,
  • sulphur dioxide,
  • sulphur trioxide, and
  • particulate matter.

The Environmental Compliance Approval with Limited Operational Flexibility (Air & Noise), when issued permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (Air & Noise). The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number

Comment

Commenting is now closed.

The comment period was from July 11, 2024
to August 25, 2024

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice