Lafarge Canada Inc. - Environmental Compliance Approval (air)

Instrument type: Environmental Compliance Approval (air)

ERO number
019-9063
Ministry reference number
7912-D6CLEA
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal
Proposal posted
Comment period
August 15, 2024 - September 29, 2024 (45 days) Closed
Last updated

This consultation was open from:

August 15, 2024
to September 29, 2024

Proposal summary

This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air & noise) for Lafarge Canada Inc., a reclaimed concrete and asphalt pavement crushing plant, located in the City of Mississauga, Ontario.

Location details

Site address

2531 Cawthra Road
Mississauga, ON
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Lafarge Canada Inc.
6509 Airport Road
Mississauga, ON
L4V 1S7
Canada

Proposal details

This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air & noise) which replaces all the current Environmental Compliance Approvals for air at this facility and includes the addition of new or historically unapproved sources for all emissions from Lafarge Canada Inc., a reclaimed concrete and asphalt pavement crushing plant, located in the City of Mississauga, Ontario.

The application includes all sources at the facility, including crushing operations, handling and conveying of aggregate materials, maintenance activities, natural gas fired heating, and onsite vehicle fueling, storage and transportation.

Emissions to the air from this facility include:

  • suspended particulate matter,
  • respirable crystalline silica (quartz),
  • sodium chloride,
  • carbon monoxide,
  • sulphur dioxide, and
  • nitrogen oxides

The Environmental Compliance Approval with Limited Operational Flexibility (air & noise), when issued permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air & noise). The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number

Comment

Commenting is now closed.

The comment period was from August 15, 2024
to September 29, 2024