This consultation was open from:
August 21, 2024
to September 20, 2024
Proposal summary
This proposal is for a renewal to Permit to Take Water No. 0323-9MBQZR for J.A. Porter Holdings (Lucknow) Ltd. Water will be taken from one pond and one well for industrial and aggregate washing purposes in Lucknow, Township of Huron-Kinloss, Ontario.
Location details
Site address
85 Torrence Street
Lot 51 and 52, Concession 1
Lucknow,
ON
Canada
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
J.A. Porter Holdings (Lucknow) Ltd.
4 Washington Street
Lucknow,
ON
N0G 2H0
Canada
Proposal details
This proposal is for a renewal to Permit to Take Water No. 0323-9MBQZR for J.A. Porter Holdings (Lucknow) Ltd. Water will be taken from one pond and one well for industrial and aggregate washing purposes in Lucknow, Township of Huron-Kinloss, Ontario. Details of the water taking are as follows:
Permit type - renewal
Source Name: Production Well 1
- purpose: other - industrial
- maximum rate per minute (litres): 340
- maximum number of hours of taking per day: 10
- maximum volume per day (litres): 204,000
- maximum number of days of taking per year: 259
- earliest calendar date of taking (mm/dd): 04/01
- latest calendar date of taking (mm/dd): 12/15
- period of taking: 10 years
Source Name: Dugout Pond
- purpose: aggregate washing
- maximum rate per minute (litres): 2,273
- maximum number of hours of taking per day: 12
- maximum volume per day (litres): 1,636,560
- maximum number of days of taking per year: 259
- earliest calendar date of taking (mm/dd): 04/01
- latest calendar date of taking (mm/dd): 12/15
- period of taking: 10 years
There are 3 categories of a Permit to Take Water:
- Category 1: water takings are anticipated to have a lower risk of causing an unacceptable environmental impact/interference
- Category 2: water takings are anticipated to having a higher potential of causing unacceptable environmental impact or interference
- Category 3: water takings are anticipated to have the highest potential of causing unacceptable environmental impactor interference
The proposed water taking qualifies as a Category 3 permit.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Comment
Commenting is now closed.
The comment period was from August 21, 2024
to September 20, 2024