This consultation was open from:
September 19, 2024
to November 3, 2024
Proposal summary
This proposal is for a new Environmental Compliance Approval (sewage) to install a stormwater management system for the collection, transmission, treatment and disposal of stormwater, in support of a proposed mushroom production facility, located at 2524 Blue Church Road, in the Township of Augusta, United Counties of Leeds and Grenville, Ontario.
Location details
Site address
2524 Blue Church Road
Augusta,
ON
Canada
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
Eastern Ontario Mushroom Producers
Post Office Box 549
Ottawa,
ON
K0A 2W0
Canada
Proposal details
This proposal is for a new Environmental Compliance Approval (sewage) for Carleton Mushroom Farms Sales Ltd., Champag Inc., and Sharon Mushroom Farm Ltd., as general partners of Eastern Ontario Mushroom Producers, to install a stormwater management system for the collection, transmission, treatment and disposal of stormwater, in support of a proposed mushroom production facility, located at 2524 Blue Church Road, in the Township of Augusta, United Counties of Leeds and Grenville, Ontario.
The proposed stormwater management facilities include a hybrid wet pond/infiltration and grass swales for quantity and quality control, discharging via drainage ditches within the South Nation River Watershed.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Comment
Commenting is now closed.
The comment period was from September 19, 2024
to November 3, 2024