Apotex Inc. - Environmental Compliance Approval (air)

Instrument type: Environmental Compliance Approval (air)

ERO number
019-9215
Ministry reference number
9313-D7NJM6
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal
Proposal posted
Comment period
September 25, 2024 - November 9, 2024 (45 days) Closed
Last updated

This consultation was open from:

September 25, 2024
to November 9, 2024

Proposal summary

This proposal is for the renewal of the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 6410-9L7PAA for Apotex Inc., a pharmaceutical manufacturing facility, located in the City of Richmond Hill, Ontario.

Location details

Site address

380 Elgin Mills Road East
Richmond Hill, ON
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Apotex Inc.
4100 Weston Road
Toronto, ON
M9L 2Y6
Canada

Proposal details

This proposal is for the renewal of the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 6410-9L7PAA for Apotex Inc., a pharmaceutical manufacturing facility, located in the City of Richmond Hill, Ontario.

The emission sources from the manufacturing and associated processes that discharge to the air include:

  • air handling units,
  • boilers,
  • two on-site diesel generators,
  • dispensing and compounding processes,
  • storage tanks,
  • compounding tanks,
  • exhaust vents,
  • solvent and waste chemical storage areas,
  • process wash-up areas,
  • equipment cleaning,
  • fume hoods, and
  • cooling towers

Emissions to the air from this facility include:

  • acetonitrile,
  • chloroform,
  • dichloromethane,
  • nitrogen oxides, and
  • noise

The Environmental Compliance Approval with Limited Operational Flexibility (air & noise), when issued, permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air & noise). The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number

Comment

Commenting is now closed.

The comment period was from September 25, 2024
to November 9, 2024

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice