TransAlta Cogeneration Ltd. as general partner for and on behalf of TransAlta Cogeneration L.P. - Environmental Compliance Approval (air)

Instrument type: Environmental Compliance Approval (air)

ERO number
019-9311
Ministry reference number
5479-D9EGE5
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal
Proposal posted
Comment period
October 28, 2024 - December 12, 2024 (45 days) Closed
Last updated

This consultation was open from:

October 28, 2024
to December 12, 2024

Proposal summary

This proposal is for the renewal of the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 6245-9CBRLP for TransAlta Cogeneration Ltd., as general partner for and on behalf of TransAlta Cogeneration L.P., a co-generation plant, located in the City of Ottawa, Ontario.

Location details

Site address

405 Smyth Road
Ottawa, ON
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

TransAlta Cogeneration Ltd. as general partner for and on behalf of TransAlta Cogeneration L.P.
405 Smyth Road
Ottawa, ON
K1H 8M8
Canada

Proposal details

This proposal is for the renewal of the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 6245-9CBRLP for TransAlta Cogeneration Ltd., as general partner for and on behalf of TransAlta Cogeneration L.P., a co-generation plant, located in the City of Ottawa, Ontario. This proposal includes all emission sources from the manufacturing and associated processes that exhaust to the atmosphere including raw materials handling, power and steam generation, heat recovery and other auxiliary processes and equipment. Emissions to the atmosphere from this facility include:

  • particulate matter,
  • nickel,
  • hydrotreated light naphthenic distillate, and
  • products of combustion such as nitrogen oxides, and carbon monoxide

The Environmental Compliance Approval with Limited Operational Flexibility (air), when issued, permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air). The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada

Office phone number

Comment

Commenting is now closed.

The comment period was from October 28, 2024
to December 12, 2024