St. Marys Cement Inc. (Canada) - Permit to take water

Instrument type: Permit to take water

ERO number
019-9328
Ministry reference number
1000312000
Notice type
Instrument
Act
Ontario Water Resources Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal
Proposal posted
Comment period
October 30, 2024 - November 29, 2024 (30 days) Closed
Last updated

This consultation was open from:

October 30, 2024
to November 29, 2024

Proposal summary

This proposal is for the renewal of Permit to Take Water No. 6440-9Z5QZ5 for St. Marys Cement Inc. (Canada). Water will be taken from one pond for aggregate washing purposes at the Woodville Pit, located in Woodville, Ontario.

Location details

Site address

465 Black School Road
Woodville, ON
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

St. Marys Cement Inc. (Canada)
55 Industrial Street
Toronto, ON
M4G 3W9
Canada

Proposal details

This proposal is for the renewal of Permit to Take Water No. 6440-9Z5QZ5 for St. Marys Cement Inc. (Canada). Water will be taken from one pond for aggregate washing purposes at the Woodville Pit, located in Woodville, Ontario. Details of the water taking are as follows:

Source Name: Source Pond

  • purpose of taking: aggregate washing
  • maximum rate per minute (litres): 3,410
  • maximum number of hours of taking per day: 12
  • maximum Volume of taking per day (litres): 2,455,200
  • maximum number of days of taking in a year: 365
  • length of taking: January 1 to December 31 for 10 years

There are 3 categories of a Permit to Take Water:

  • Category 1: water takings are anticipated to have a lower risk of causing an unacceptable environmental impact/interference
  • Category 2: water takings are anticipated to having a higher potential of causing unacceptable environmental impact or interference
  • Category 3: water takings are anticipated to have the highest potential of causing unacceptable environmental impactor interference

The proposed water taking qualifies as a Category 1 permit.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada

Office phone number

Comment

Commenting is now closed.

The comment period was from October 30, 2024
to November 29, 2024

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice