Southshore Greenhouses Inc. and Mucci Farms Ltd. - Environmental Compliance Approval (sewage)

Instrument type: Environmental Compliance Approval (sewage)

ERO number
019-9450
Ministry reference number
9831-D4MJ2G
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal
Proposal posted
Comment period
December 5, 2024 - January 19, 2025 (45 days) Open
Last updated

This consultation closes at 11:59 p.m. on:
January 19, 2025

Proposal summary

This proposal from Southshore Greenhouses Inc. and Mucci Farms Ltd. is to amend Environmental Compliance Approval numbers 3622-CJ44K5, 4487-CHR53P and 7750-CJ44YE for new stormwater management facilities and modifications to an existing works located at 1670 Seacliff Drive East, and 1717 Road 2 East, in the Town of Kingsville, Essex, Ontario.

Location details

Site address

1670 Seacliff Drive and 1717 Road 2 East
Town of Kingsville, ON
Canada

Site location details

1670 Seacliff Drive and 1717 Road 2 East

Town of Kingsville, County of Essex, Ontario

Easting: 361830 Northing: 4655541

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Southshore Greenhouses Inc. and Mucci Farms Ltd.
1670 Seacliff Drive
Kingsville, ON
N9Y 2M6
Canada

Proposal details

This proposal from Southshore Greenhouses Inc. and Mucci Farms Ltd. is to amend Environmental Compliance Approval numbers 3622-CJ44K5, 4487-CHR53P and 7750-CJ44YE for new stormwater management facilities and modifications to an existing S.W.M. pond to accommodate the new greenhouse expansion and existing greenhouse ranges for collection, transmission, treatment and disposal of stormwater run-off from the lands located at 1670 Seacliff Drive East, and 1717 Road 2 East, in the Town of Kingsville, County of Essex, Ontario.

The stormwater management works consist of the following:

  1. Roof water drainage pipe systems, swales and on-site storm sewers, discharging roof top runoff and other surface runoff to the shared stormwater detention pond;
  2. One stormwater management detention/wet pond having an active storage volume of 22,439 cubic metres with a maximum active water depth of 3.718 metres for the 1:100 year storm event, discharging a maximum (total) release rate of 383 litres per second into the Ravine (172 litres per second) and the 2nd Concession Branch of the Esseltine Drain (211 litres per second);
  3. One stormwater dewatering pump station located near the southwest corner of the pond;
  4. One emergency overflow spillway directing flows to the west natural watercourse; and
  5. One Oil Grit Separator (OGS) model FD-4HC or approved equal, serving the warehouse parking areas

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada

Office phone number

Comment

Let us know what you think of our proposal.

Have questions? Get in touch with the contact person below. Please include the ERO number for this notice in your email or letter to the contact.

Read our commenting and privacy policies.

Submit online

Submit by mail

Contact

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice